Skip to content
Division of Capital Asset Management and Maintenance

STC2202 Request for Qualifications for Trade Contractors, Springfield Technical Community College

Solicitation: Not available
Notice ID: ma_commbuys_a31db08e60907ffbee06

Federal opportunity from DCP04 - Bid Room • Division of Capital Asset Management and Maintenance. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
DCAMM Bid Room 1 Ashburton Place, 15th Floor Boston, MA 02108 US Email: bidroom.dcamm@state.ma.us Phone: (617) 727-4003
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Capital Asset Management and Maintenance
Agency
DCP04 - Bid Room
Subagency
DCP04 - Bid Room
Office
James Hohmann
Contracting Office Address
Not available

Description

Request for Qualifications for One (1) Trade Contractor Package: Glass & Glazing ($173,130), for STC - School of Health and Patient Simulation (SHPS) Modernization, Springfield Technical Community College, Springfield, MA. This Project will relocate the School of Health and Patient Simulation from Building 20 to Building 2 by renovating five of the existing seven floors within Building 2. The Construction Manager is Barr & Barr, Inc.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity involves the Request for Qualifications for a Trade Contractor Package focused on Glass & Glazing, with a budget of $173,130 for the modernization of the School of Health and Patient Simulation at Springfield Technical Community College. The project encompasses relocating the program to Building 2 and renovating five floors. Interested contractors must respond by February 25, 2026.

Trade ContractorsGlass and GlazingSpringfield Technical Community CollegeConstruction ManagerRenovation Project
What the buyer is trying to do

The buyer is seeking qualified trade contractors to perform glass and glazing work as part of the modernization project at Springfield Technical Community College.

Who should pursue this
  • Contractors experienced in glass and glazing work
  • Companies with a portfolio in educational facility renovations
  • Firms located near Springfield, MA for logistical advantages
Work breakdown
  • Submit qualifications for the Glass & Glazing package
  • Coordinate with the Construction Manager Barr & Barr, Inc.
  • Participate in project planning and scheduling
  • Ensure compliance with project specifications and deliverables
Response package checklist
  • Completed qualifications statement
  • List of relevant experience and projects
  • Key personnel resumes
  • Safety record documentation
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to local building codes and regulations
  • Follow guidelines set by the Construction Manager Barr & Barr, Inc.
Pricing strategy
  • Bid competitively based on detailed cost analysis of glazing materials and labor
  • Consider potential overhead costs related to project coordination
Teaming and subs
  • Consider teaming with local suppliers of glass to ensure timely delivery
  • Engage with subcontractors who specialize in glass installations to enhance capacity
Risks and watchouts
  • Potential delays in obtaining materials due to supply chain issues
  • Cost overruns if the scope of glazing work is underestimated
Smart questions to ask
  • What specific deadlines must be met during the project timeline?
  • Are there any unique design specifications for the glazing work?
  • What are the payment terms and conditions?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No posted date provided
  • Lack of detailed scope for the glazing package
  • No specific design requirements outlined
  • Absence of performance bond requirements
  • No information on competition or number of expected bidders

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.