Rail:Ware River Secondary Track & Row Rehabilitation Project
Federal opportunity from 0T100 - RAIL AND TRANSIT • Department of Transportation. Place of performance: MA. Response deadline: Apr 17, 2026. Industry: NAICS 95, 12, 16, 72, 14, 00, 15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
MassDOT Ware River Secondary Track & ROW Rehabilitation Project: Pre-Construction Survey and As-Built Plans Removal/Demolition of Existing Track Line, surface and tamp turnouts Installation (see bid document)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
0T100 - RAIL AND TRANSIT issued solicitation Rail:Ware River Secondary Track & Row Rehabilitation Project, with NAICS 95, 12, 16, 72, 14, 00. MassDOT Ware River Secondary Track & ROW Rehabilitation Project: Pre-Construction Survey and As-Built Plans Removal/Demolition of Existing Track Line, surface and tamp turnouts Installation (see bid document) The record currently includes 2 linked source attachments for review.
MassDOT Ware River Secondary Track & ROW Rehabilitation Project: Pre-Construction Survey and As-Built Plans Removal/Demolition of Existing Track Line, surface and tamp turnouts Installation (see bid document)
- Solicitation contractors with direct experience delivering comparable work for public buyers.
- Firms eligible for SBPP Eligible: YES.
- Teams aligned to NAICS 95, 12, 16, 72, 14, 00.
- Rail:Ware River Secondary Track & Row Rehabilitation Project
- Review 2 linked source documents.
- Download and review all official solicitation documents and addenda.
- Confirm submission format, due date, and delivery method with the buyer portal or notice.
- Prepare pricing, scope response, and required forms/certifications.
- Validate eligibility for SBPP Eligible: YES.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Notice references set-aside: SBPP Eligible: YES.
- Notice aligns to NAICS 95, 12, 16, 72, 14, 00.
- Validate insurance, licensing, and any site-access requirements in the official documents.
- Price to the actual scope and staffing assumptions in the official documents.
- Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
- Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
- Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
- Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
- Due date is Apr 17, 2026; verify exact due time and timezone.
- Do not assume unstated requirements, contract duration, or evaluation factors.
- Are there mandatory site visits, staffing minimums, or licensing requirements?
- What exact documents and forms must be submitted at bid time?
- Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Contracting office/contact is not clearly identified.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.