Skip to content
Department of Transportation

608940 WESTON FAP No. HSI-0036(022)X Intersection Improvements Boston Post Road (Route 20) at Wel

Solicitation: BD-26-1030-0H100-0H002-127285
Notice ID: ma_commbuys_b7cc4a9fe06dffaf0ec1
Source codes72, 14, 10Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0h100 - HighwayStateMAPostedMar 30, 2026, 10:14 AM UTCDueApr 28, 2026, 02:00 PM UTCExpiredBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Apr 28, 2026. Industry: Source industry codes 72, 14, 10.

Source
Open on official portal →
Solicitation
BD-26-1030-0H100-0H002-127285
Performance
Park Plaza Boston, MA 02116
Response
Apr 28, 2026, 02:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Park Plaza Boston, MA 02116
State: MA
Contracting office
Construction Unit 10 Park Plaza Boston, MA 02116 US

Point of Contact

Name
eric.m.cardone
Email
eric.m.cardone@dot.state.ma.us
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
0H002 - Construction Statewide Contracts
Contracting Office Address
Construction Unit 10 Park Plaza Boston, MA 02116 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260001 (Rev 1)
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
90 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 88 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
TERRAZZO FINISHER
Base $63.44Fringe $37.33
Rate
MARBLE, TILE & TERRAZZO WORKERS
Base $64.52Fringe $37.51
+40 more occupation rates in this WD
Davis-Baconstate match
MA20260024 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Suffolk
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+23 more occupation rates in this WD

Description

Do Not Use COMMBUYS to Bid on this Project

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

This notice (ID: ma_commbuys_b7cc4a9fe06dffaf0ec1) is titled “608940 WESTON FAP No. HSI-0036(022)X Intersection Improvements Boston Post Road (Route 20) at Wel” and is issued by 0H100 – HIGHWAY. The response deadline shown is 2026-04-28T14:00:00+00:00. The description explicitly states: “Do Not Use COMMBUYS to Bid on this Project,” so the primary capture action is to obtain the attached bid detail package and follow the alternate bidding instructions. SBPP Eligible is marked YES, which may affect eligibility/participation requirements depending on the actual procurement method described in the attachment.

608940WestonFAP No. HSI-0036(022)XIntersection ImprovementsBoston Post RoadRoute 200H100 HIGHWAYDo Not Use COMMBUYS
What the buyer is trying to do

Procure intersection improvements for Boston Post Road (Route 20) in Weston under project reference “FAP No. HSI-0036(022)X” (as indicated in the title), using a submission method other than COMMBUYS.

Who should pursue this
  • Firms experienced in roadway/intersection improvement construction and related civil/highway work, able to comply with the non-COMMBUYS submission process required by 0H100 – HIGHWAY
  • SBPP-eligible small businesses if the attachment confirms SBPP participation requirements or preferences for this procurement
Work breakdown
  • Review the attached bid detail package from COMMBUYS download link for full scope, plan/specs, and bid submission instructions
  • Confirm bid submission channel (non-COMMBUYS) and required forms per the attachment
  • Prepare bid package for intersection improvements at Boston Post Road (Route 20) in Weston (per the attachment’s technical requirements)
  • Validate SBPP eligibility implications (noted as “SBPP Eligible: YES”) against the actual bid instructions
Response package checklist
  • Download and review the attached bid detail package (docId BD-26-1030-0H100-0H002-127285; downloadFileNbr=2207202) for complete bid requirements
  • Confirm and follow the non-COMMBUYS bid submission method stated in the attachment
  • Include all bid forms, certifications, and pricing schedules required in the attachment
  • Submit by the stated deadline: 2026-04-28T14:00:00+00:00
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Do not submit the bid through COMMBUYS; the notice explicitly instructs: “Do Not Use COMMBUYS to Bid on this Project.”
  • SBPP status is indicated as eligible ("SBPP Eligible: YES"); confirm any mandatory/optional SBPP steps in the attachment
Pricing strategy
  • Price to the bid schedule and measurement/payment items contained in the attachment; the notice text itself does not provide bid items or quantities
  • Account for compliance/admin effort created by the non-COMMBUYS submission process (e.g., packaging, delivery method) as allowed by the bid structure in the attachment
Teaming and subs
  • Identify subcontractors aligned with intersection improvement work once the attachment clarifies scope (e.g., traffic control, pavement markings/signage, signal work) and ensure they can meet the submission and compliance requirements stated outside COMMBUYS
Risks and watchouts
  • Disqualification risk if any part of the bid is submitted through COMMBUYS contrary to the instruction in the description
  • High risk of missing required forms or submission steps because key requirements appear to be contained only in the attachment link
  • NAICS/PSC fields appear inconsistent or broad in the notice (NAICS listed as 72, 14, 10); rely on the attachment for the actual construction classification and compliance requirements
Smart questions to ask
  • What is the exact bid submission method (mail, in-person drop, email portal, etc.) and where is it specified in the attached bid detail package?
  • Does “SBPP Eligible: YES” impose any required small business participation documentation for this specific bid, and if so, what forms are required?
  • Are there addenda outside COMMBUYS, and how will addenda be issued given the instruction not to bid via COMMBUYS?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Attachment contents (scope, bid forms, submission method, location details, and technical requirements) are not provided in the brief
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1030-0H100-0H002-127285
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.