Skip to content
Department of Transportation

610802 SOMERSET FAP No. PRC(PRC80)-003S(949)X Stormwater Improvements along Route 6, Route 138, an

Solicitation: Not available
Notice ID: ma_commbuys_1fbe1aac50c464e572c0
NAICS 72, 14, 10Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0h100 - HighwayStateMAPostedDueApr 28, 2026, 02:00 PM UTCCloses in 19 days

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Apr 28, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,606,932,264
Sector total $1,606,932,264 • Share 100.0%
Live
Median
$85,110
P10–P90
$27,155$718,615
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,606,932,264)
Deal sizing
$85,110 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves stormwater improvements along Route 6 and Route 138, as outlined in notice ID ma_commbuys_1fbe1aac50c464e572c0. The project is set aside for small business participation under the SBPP program, and responses are due by April 28, 2026. This work, under the Highways agency, is crucial for improving local infrastructure and managing stormwater effectively.

stormwater improvementsRoute 6Route 138SBPPinfrastructure enhancements
What the buyer is trying to do

The buyer seeks to undertake stormwater improvements to enhance drainage and reduce flooding risks along specified routes, emphasizing localized infrastructure enhancements.

Who should pursue this
  • Small businesses eligible under the SBPP
  • Contractors specialized in stormwater management
  • Civil engineering firms with infrastructure experience
Work breakdown
  • Identify required stormwater management methods
  • Plan and design necessary improvements
  • Execute construction activities along Route 6 and Route 138
  • Conduct environmental assessments as necessary
Response package checklist
  • Completed response form
  • Proof of SBPP eligibility
  • Detailed project timeline
  • List of relevant project experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local, state, and federal regulations regarding stormwater management
  • Adhere to bidding requirements specified in the buyer's notice
Pricing strategy
  • Consider competitive pricing to accommodate small business factors
  • Estimate costs based on materials, labor, and environmental assessments
Teaming and subs
  • Local subcontractors with stormwater management expertise
  • Environmental assessment firms for regulatory compliance
Risks and watchouts
  • Potential delays due to environmental assessments
  • Changes in local regulations impacting project scope
  • Weather-related disruptions affecting construction timeline
Smart questions to ask
  • What are the specific criteria for SBPP eligibility?
  • Are there any mandatory pre-bid meetings or requirements?
  • What are the expected milestones for project completion?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget allocated for the project
  • Details on the scope of the stormwater improvements
  • Any pre-bid meeting dates or requirements
  • Potential penalties for late completion
  • Clarification on the types of materials to be used
  • Any previous studies conducted on drainage issues
  • Local environmental regulations affecting project execution

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.