Skip to content
Department of Transportation

611942 SHEFFIELD FAP No. HIP(NGB)-003S(928)X Superstructure Replacement, S-10-024, County Road ov

Solicitation: Not available
Notice ID: ma_commbuys_a655a9e769c57e837323

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Mar 17, 2026. Industry: NAICS 72, 14, 11.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 01, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves the Sheffield FAP No. HIP(NGB)-003S(928)X Superstructure Replacement on County Road S-10-024, issued by the Highway agency. The project is eligible under the SBPP program and has a response deadline of March 17, 2026. Specific bidding instructions indicate that Commbuys should NOT be used for submissions.

Superstructure ReplacementHighway ConstructionInfrastructure ImprovementSBPP EligibleSmall Business Participation
What the buyer is trying to do

The buyer aims to replace the superstructure for the specified road as part of a highway infrastructure improvement initiative.

Who should pursue this
  • Small businesses that are eligible under the SBPP program
  • Companies with experience in highway construction and infrastructure projects
  • Firms that specialize in structural engineering
Work breakdown
  • Project planning and design assessment
  • Superstructure removal and disposal
  • New superstructure construction
  • Quality assurance and safety compliance checks
  • Final inspection and project handover
Response package checklist
  • Completed bid proposal including details on technical capabilities
  • Proof of eligibility under SBPP
  • Cost breakdown for the project
  • Timeline and estimated completion dates
  • Relevant past performance references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all response materials comply with local and federal regulations
  • Adhere to SBPP eligibility criteria
Pricing strategy
  • Consider competitive pricing based on market research of similar projects
  • Include a detailed justification for pricing structure
Teaming and subs
  • Consider partnering with local subcontractors for specific project components
  • Utilize firms with established relationships with government agencies
  • Leverage subcontractor expertise in specialized areas such as safety compliance
Risks and watchouts
  • Potential delays if project specifications change late in the bidding process
  • Regulatory compliance risks tied to construction practices
  • Financial risks if project costs exceed initial estimates
Smart questions to ask
  • What is the expected start date for project activities?
  • Are there any specific materials preferred or mandated for this project?
  • What is the estimated annual budget allocated for this replacement project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work beyond initial description
  • Information on existing superstructure conditions
  • Specific budget allocation for the project expenses
  • Details on how to submit bids if not using Commbuys
  • Any upcoming pre-bid meetings or conferences

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.