611942 SHEFFIELD FAP No. HIP(NGB)-003S(928)X Superstructure Replacement, S-10-024, County Road ov
Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Mar 17, 2026. Industry: NAICS 72, 14, 11.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
Do Not Use COMMBUYS to Bid on this Project
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves the Sheffield FAP No. HIP(NGB)-003S(928)X Superstructure Replacement on County Road S-10-024, issued by the Highway agency. The project is eligible under the SBPP program and has a response deadline of March 17, 2026. Specific bidding instructions indicate that Commbuys should NOT be used for submissions.
The buyer aims to replace the superstructure for the specified road as part of a highway infrastructure improvement initiative.
- Small businesses that are eligible under the SBPP program
- Companies with experience in highway construction and infrastructure projects
- Firms that specialize in structural engineering
- Project planning and design assessment
- Superstructure removal and disposal
- New superstructure construction
- Quality assurance and safety compliance checks
- Final inspection and project handover
- Completed bid proposal including details on technical capabilities
- Proof of eligibility under SBPP
- Cost breakdown for the project
- Timeline and estimated completion dates
- Relevant past performance references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all response materials comply with local and federal regulations
- Adhere to SBPP eligibility criteria
- Consider competitive pricing based on market research of similar projects
- Include a detailed justification for pricing structure
- Consider partnering with local subcontractors for specific project components
- Utilize firms with established relationships with government agencies
- Leverage subcontractor expertise in specialized areas such as safety compliance
- Potential delays if project specifications change late in the bidding process
- Regulatory compliance risks tied to construction practices
- Financial risks if project costs exceed initial estimates
- What is the expected start date for project activities?
- Are there any specific materials preferred or mandated for this project?
- What is the estimated annual budget allocated for this replacement project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work beyond initial description
- Information on existing superstructure conditions
- Specific budget allocation for the project expenses
- Details on how to submit bids if not using Commbuys
- Any upcoming pre-bid meetings or conferences
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.