612050 BRAINTREE-WEYMOUTH FAP No. NHP(NHS)-003S(923)X Resurfacing and Related Work on Route 3
Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 14, 10.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
Do Not Use COMMBUYS to Bid on this Project
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity titled '612050 BRAINTREE-WEYMOUTH FAP No. NHP(NHS)-003S(923)X Resurfacing and Related Work on Route 3' involves resurfacing and related works in the Braintree-Weymouth area, under the oversight of the Highway Agency. The response deadline for submissions is set for February 18, 2026. This project is SBPP eligible, making it a favorable bid for small businesses.
The buyer aims to engage contractors for resurfacing and related road work along Route 3, ensuring improved road conditions and safety.
- Small businesses with experience in road construction and resurfacing
- Contractors familiar with highway work standards
- Firms with a track record of compliance with governmental regulations
- Site assessment and preparation
- Asphalt resurfacing
- Traffic management plan development
- Post-construction quality evaluation
- Completed bid forms
- Proof of eligibility for SBPP
- Relevant past project references
- Safety and compliance documentation
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to state and federal regulations for roadwork
- Compliance with SBPP eligibility requirements
- Competitive pricing based on market analysis for similar projects
- Consideration of cost-effective materials and methods
- Partnerships with local subcontractors for specialized work (e.g., traffic management)
- Collaboration with environmental consultants for compliance requirements
- Potential delays due to weather conditions affecting the construction schedule
- Regulatory compliance risks regarding environmental impacts
- Fluctuations in material costs
- What are the specific requirements for material quality?
- Are there any anticipated utility conflicts during construction?
- What is the expected traffic impact during the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work documents
- Specific materials required
- Full contact details for the buyer
- Regular updates on project timelines
- Information on existing road conditions to assess work extent
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.