Skip to content
Department of Transportation

612004 EVERETT SOMERVILLE: Mystic River Bicycle and Pedestrian Bridge, Design-Build

Solicitation: Not available
Notice ID: ma_commbuys_52d3fe06d8617d1d2be8
NAICS 72, 14, 11Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0h100 - HighwayStateMAPostedDueJun 26, 2026, 02:00 PM UTCCloses in 78 days

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Jun 26, 2026. Industry: NAICS 72, 14, 11.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 14, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest for the Design-Build Project concerning the Mystic River Bicycle and Pedestrian Bridge. This opportunity is set aside for small businesses and is scheduled for submission by June 26, 2026. Interested parties should prepare to respond according to the provided RFQ package to qualify for bidding on this project.

MassDOTDesign-BuildBicycle and Pedestrian BridgeSBPPRFQ
What the buyer is trying to do

MassDOT aims to engage qualified parties to provide design-build services for the Mystic River Bicycle and Pedestrian Bridge project, ensuring efficient and effective implementation of the project scope.

Who should pursue this
  • Small businesses with experience in design-build projects.
  • Firms with expertise in bridge construction and pedestrian pathways.
Work breakdown
  • Review the RFQ package.
  • Prepare and submit a Letter of Interest by the deadline.
  • Develop a design-build proposal if qualified after RFQ evaluation.
  • Manage project execution upon award.
Response package checklist
  • Letter of Interest submission
  • Documentation of relevant experience
  • Team qualifications and capabilities
  • References from previous design-build projects.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure eligibility under the SBPP program.
  • Adherence to all local and state regulations regarding environmental and safety standards.
Pricing strategy
  • Consider competitive pricing aligned with similar projects in the region.
  • Estimate costs based on firm budget capabilities and project specifications.
Teaming and subs
  • Partner with local small businesses for enhanced compliance with the small business set-aside.
  • Collaborate with specialized subcontractors for engineering and construction expertise.
Risks and watchouts
  • Possible delays in project approval processes by MassDOT.
  • Funding uncertainties related to state budgets.
  • Regulatory compliance issues that may arise during project execution.
Smart questions to ask
  • What are the specific qualifications required for the RFQ?
  • Are there any preferred design methodologies that MassDOT envisions for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications and requirements.
  • Specific project timeline aside from the submission deadline.
  • Information on expected budget or funding limits.
  • Criteria used for evaluating Letters of Interest.
  • Any preliminary site assessments or environmental studies that were conducted.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.