Skip to content
Department of Energy

LBE Restoration Grant Program for Solar and Decarbonized Systems (PON-ENE-2025-007)

Solicitation: BD-25-1041-ENE01-ENE01-109288
Notice ID: ma_commbuys_bb8259af1db674903bb4
DepartmentDepartment of EnergyStateMAPostedDueJun 30, 2027, 12:00 AM UTCCloses in 402 daysBid range$625,611 - $741,464
Contract snapshot

Federal opportunity from Department of Energy Resources. Place of performance: MA. Response deadline: Jun 30, 2027.

Source
Open on official portal →
Solicitation
BD-25-1041-ENE01-ENE01-109288
Performance
MA
Response
Jun 30, 2027, 12:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Catie Snyder
Email
Not available
Phone
Not available

Agency & Office

Department
Department of Energy Resources
Agency
Not available
Subagency
Not available
Office
Catie Snyder
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260001 (Rev 1)
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
90 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 88 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
TERRAZZO FINISHER
Base $63.44Fringe $37.33
Rate
MARBLE, TILE & TERRAZZO WORKERS
Base $64.52Fringe $37.51
+40 more occupation rates in this WD
Davis-Baconstate match
MA20260024 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Suffolk
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+23 more occupation rates in this WD

Description

LBE Restoration Grant Program for Solar and Decarbonized Systems (PON-ENE-2025-007)

Advisory bid range

Pricing and bid posture

medium confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 01, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The LBE Restoration Grant Program, as outlined in PON-ENE-2025-007, focuses on enhancing solar and decarbonized systems. This grant is issued by the Department of Energy Resources with a response deadline of June 30, 2027. Companies interested in advancing their sustainability efforts through solar energy technologies may find this opportunity relevant to their goals.

LBE Restoration Grantsolar energydecarbonized systemssustainabilityDepartment of Energy
What the buyer is trying to do

The buyer aims to support the development and implementation of projects that utilize solar and decarbonized systems, helping to promote sustainable energy solutions.

Who should pursue this
  • Companies specializing in solar technology
  • Firms focused on decarbonization solutions
  • Organizations with a history of managing grant-funded projects
Work breakdown
  • Review grant parameters and eligibility requirements
  • Develop project proposals focusing on solar and decarbonized systems
  • Prepare and submit applications by the deadline
  • Monitor project outcomes and compliance requirements after funding
Response package checklist
  • Complete project proposal template
  • Include all required documentation as per solicitation
  • Detailed budget breakdown for proposed project
  • Evidence of prior experience or case studies
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to sustainability standards outlined by the Department of Energy Resources
  • Follow guidelines for required reporting after grant approval
Pricing strategy
  • Consider a competitive pricing model to reflect sustainability value
  • Budget for compliance and reporting requirements post-funding
Teaming and subs
  • Partner with organizations experienced in grant management
  • Collaborate with technical experts in solar technology and decarbonization
Risks and watchouts
  • Potential changes in grant compliance requirements
  • Risk of inadequate project scope leading to rejection
  • Timeline management for proposal development
Smart questions to ask
  • What specific deliverables are required post-funding?
  • Are there particular technologies preferred for solar and decarbonized systems?
  • What metrics will be used to evaluate the success of funded projects?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed eligibility criteria for applicants
  • Specific performance metrics required after funding
  • Funding amounts available through the grant
  • Information on grant monitoring and reporting requirements
  • Clarification on collaboration rules with sub-contractors
  • Specific technologies preferred or discouraged
  • Additional resources or support available to applicants
  • Contact information for grant questions
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-25-1041-ENE01-ENE01-109288
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.