2024-125 #2 Tunnel Repairs at NCCI Gardner
Federal opportunity from DOCFS - DOC Fiscal Services Milford • Department of Correction. Place of performance: MA. Response deadline: Mar 24, 2026. Industry: NAICS UNSPSC 72-13-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Incumbent & Expiration Tracking
Competitive Heat Score
Moderate competition signal. Standard qualification and pricing discipline should hold.
- Deadline runway: 25 days remaining.
- Set-aside: Scoped as SBPP Eligible: NO.
- Market crowding: 6 nearby NAICS matches found.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-13-00
Description
Plans and specs will be available Wednesday, March 4, 2026 at 12:00PM by emailing doc-drmbidrequests@doc.state.ma.us Bid intent forms are due Monday, March 9, 2026 at 12:00PM by emailing doc-drmbidrequests@doc.state.ma.us. Questions are due Wednesday, March 18, 2026 at 3:00PM by emailing Brandon.Avila@doc.state.ma.us and Kenneth.Pinarreta@doc.state.ma.us. This project is estimated at $230,000.00.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The upcoming project involves tunnel repairs at NCCI Gardner, with an estimated cost of $230,000. Plans and specifications will be available on March 4, 2026, and bidders must submit their intents by March 9, 2026. Questions regarding the project are due by March 18, 2026, making this a key opportunity for contractors with relevant experience.
The buyer is seeking qualified contractors to perform necessary tunnel repairs at NCCI Gardner, ensuring safety and longevity of the structure.
- Acquire plans and specifications by March 4, 2026
- Submit bid intent forms by March 9, 2026
- Address questions by March 18, 2026
- Execute tunnel repairs as specified upon award
- Completed bid intent form
- Understanding of project specifications
- Relevant past performance documentation
- Proof of insurance and bonding
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed period of performance not provided
- Specific tasks involved in the tunnel repairs are unclear
- Location of NCCI Gardner not specified
- Any required licenses or certifications not mentioned
- Bid evaluation criteria are missing
- Post-award project management expectations not included
- Ground conditions or environmental considerations not addressed
- Contact details for other procurement officers absent
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.