AST Installation - Moy Ranch / DPW
Federal opportunity from PUR001 - Purchasing Department • City of Worcester. Place of performance: MA. Response deadline: Apr 22, 2026. Industry: NAICS 72, 15, 33.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
AST Installation - Moy Ranch / DPW - Bid #: 8639-W6 available via open bids page at www.worcesterma.gov
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
PUR001 - Purchasing Department issued solicitation AST Installation - Moy Ranch / DPW, with NAICS 72, 15, 33. AST Installation - Moy Ranch / DPW - Bid #: 8639-W6 available via open bids page at www.worcesterma.gov Review the linked source materials to confirm final scope, submission mechanics, and buyer instructions.
AST Installation - Moy Ranch / DPW - Bid #: 8639-W6 available via open bids page at www.worcesterma.gov
- Solicitation contractors with direct experience delivering comparable work for public buyers.
- Teams aligned to NAICS 72, 15, 33.
- AST Installation - Moy Ranch / DPW
- Download and review all official solicitation documents and addenda.
- Confirm submission format, due date, and delivery method with the buyer portal or notice.
- Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Notice aligns to NAICS 72, 15, 33.
- Validate insurance, licensing, and any site-access requirements in the official documents.
- Price to the actual scope and staffing assumptions in the official documents.
- Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
- Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
- Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
- Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
- Due date is Apr 22, 2026; verify exact due time and timezone.
- Attachment coverage is limited in the current record; check the source portal directly.
- Do not assume unstated requirements, contract duration, or evaluation factors.
- Are there mandatory site visits, staffing minimums, or licensing requirements?
- What exact documents and forms must be submitted at bid time?
- Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Set-aside status is not confirmed.
- Contracting office/contact is not clearly identified.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.