8650-M6 Resurfacing Various Roads (M25-4) / DPW
Federal opportunity from PUR001 - Purchasing Department • City of Worcester. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS 72, 14, 10.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
8650-M6 Resurfacing Various Roads (M25-4) / DPW. Solicitation notice from City of Worcester. Review the official posting for scope, requirements, and submission details.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Worcester is seeking bids for the resurfacing of various roads under the solicitation 8650-M6. The response deadline for this bid is set for March 25, 2026. Companies specializing in road construction and resurfacing should review the official posting for detailed scope and requirements.
The buyer aims to engage contractors to resurface various roads to improve road infrastructure and safety in Worcester.
- Contractors with experience in road resurfacing
- Companies with relevant qualifications and certifications
- Firms that can demonstrate past performance in similar projects
- Review official solicitation posting for detailed requirements
- Prepare bid proposals including technical qualifications
- Submit bids by the response deadline of March 25, 2026
- Ensure compliance with all local regulations and standards
- Completed bid proposal
- Evidence of past performance
- Relevant certifications and licenses
- Compliance documentation with local regulations
- Pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure bids adhere to City of Worcester procurement regulations
- Verify all proposed materials meet state and local standards
- Consider competitive pricing based on current market rates for road work
- Include all cost factors such as labor, materials, and overhead
- Consider partnering with local subcontractors experienced in road work
- Identify suppliers for road materials to ensure timely delivery
- Potential delays due to weather affecting the resurfacing timeline
- Competition from other firms may drive prices down
- Regulatory compliance issues may arise if documentation is incomplete
- What are the specific materials and methods required for the resurfacing?
- Are there penalties for delays, and what are the completion timelines?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work not provided
- Specific requirements for bidding not outlined
- Pricing guidelines or estimates not included
- No information about pre-bid meetings or site visits
- Absence of attachment links for additional details
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.