Northeast Elementary Inclusive Playground Construction, 2026
Federal opportunity from WLTHM - Purchasing Department • City of Waltham. Place of performance: MA. Response deadline: Apr 16, 2026. Industry: NAICS 72, 13, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
Northeast Elementary Inclusive Playground Construction, 2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Northeast Elementary Inclusive Playground Construction project, set for 2026, aims to create an inclusive play environment for children. Managed by the WLTHM Purchasing Department, this opportunity aligns with the NAICS codes 72 (Accommodation and Food Services) and 13 (Agriculture, Forestry, Fishing and Hunting). The response deadline is on April 16, 2026, providing bidders ample time to prepare their proposals.
The buyer is seeking qualified contractors to design and construct an inclusive playground that accommodates children of all abilities, fostering an accessible play environment.
- Contractors with experience in playground construction
- Firms specializing in inclusive design
- Companies with a portfolio of relevant projects
- Design planning for the inclusive playground
- Preparation of site and foundation work
- Installation of playground equipment and safety features
- Landscaping and finishing touches to the playground area
- Project plan outlining design and construction phases
- Previous project examples and client references
- Detailed pricing proposal and timeline
- Compliance with ADA and local safety regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all designs meet ADA standards for accessibility
- Follow local construction codes and regulations
- Consider competitive pricing while ensuring high-quality materials and labor
- Outline pricing based on phases of work to enhance budget clarity
- Consider partnering with local landscaping firms for site finishing
- Engage specialists in inclusive play equipment for product sourcing
- Potential delays in obtaining necessary permits
- Risk of underestimating project costs due to material price fluctuations
- Need for ongoing community engagement to align project goals
- What specific inclusive features are required in the playground design?
- Are there existing community preferences or involvement in the project?
- What is the total budget allocated for this construction project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for playground equipment
- Budget range for the project
- Community engagement requirements
- Exact location details for the construction
- Timeline for contractor selection
- Potential environmental concerns regarding the site
- List of stakeholders involved in the project
- Regulatory approvals needed prior to construction
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.