Skip to content
City of Waltham

Northeast Elementary Inclusive Playground Construction, 2026

Solicitation: Not available
Notice ID: ma_commbuys_10fd538185996c214389
NAICS 72, 13, 00DepartmentCity of WalthamAgencyWLTHM - Purchasing DepartmentStateMAPostedDueApr 16, 2026, 10:00 AM UTCCloses in 6 days

Federal opportunity from WLTHM - Purchasing Department • City of Waltham. Place of performance: MA. Response deadline: Apr 16, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$6,934,604,320
Sector total $6,934,604,320 • Share 100.0%
Live
Median
$206,573
P10–P90
$30,957$1,243,935
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,934,604,320)
Deal sizing
$206,573 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Crystal Philpott 610 Main Street Waltham, MA 02452 US Email: cphilpott@city.waltham.ma.us Phone: (781) 314-3244
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Waltham
Agency
WLTHM - Purchasing Department
Subagency
WLTHM - Purchasing Department
Office
Crystal Philpott
Contracting Office Address
Not available

Description

Northeast Elementary Inclusive Playground Construction, 2026

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 29, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Northeast Elementary Inclusive Playground Construction project, set for 2026, aims to create an inclusive play environment for children. Managed by the WLTHM Purchasing Department, this opportunity aligns with the NAICS codes 72 (Accommodation and Food Services) and 13 (Agriculture, Forestry, Fishing and Hunting). The response deadline is on April 16, 2026, providing bidders ample time to prepare their proposals.

Inclusive playgroundConstructionPlayground equipmentADA compliance
What the buyer is trying to do

The buyer is seeking qualified contractors to design and construct an inclusive playground that accommodates children of all abilities, fostering an accessible play environment.

Who should pursue this
  • Contractors with experience in playground construction
  • Firms specializing in inclusive design
  • Companies with a portfolio of relevant projects
Work breakdown
  • Design planning for the inclusive playground
  • Preparation of site and foundation work
  • Installation of playground equipment and safety features
  • Landscaping and finishing touches to the playground area
Response package checklist
  • Project plan outlining design and construction phases
  • Previous project examples and client references
  • Detailed pricing proposal and timeline
  • Compliance with ADA and local safety regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all designs meet ADA standards for accessibility
  • Follow local construction codes and regulations
Pricing strategy
  • Consider competitive pricing while ensuring high-quality materials and labor
  • Outline pricing based on phases of work to enhance budget clarity
Teaming and subs
  • Consider partnering with local landscaping firms for site finishing
  • Engage specialists in inclusive play equipment for product sourcing
Risks and watchouts
  • Potential delays in obtaining necessary permits
  • Risk of underestimating project costs due to material price fluctuations
  • Need for ongoing community engagement to align project goals
Smart questions to ask
  • What specific inclusive features are required in the playground design?
  • Are there existing community preferences or involvement in the project?
  • What is the total budget allocated for this construction project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for playground equipment
  • Budget range for the project
  • Community engagement requirements
  • Exact location details for the construction
  • Timeline for contractor selection
  • Potential environmental concerns regarding the site
  • List of stakeholders involved in the project
  • Regulatory approvals needed prior to construction

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.