IFB No. 26-110: Interior Painting at Central High School
Federal opportunity from PUR02 - Procurement • City of Springfield. Place of performance: MA. Response deadline: Feb 26, 2026. Industry: NAICS 72, 10, 24.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 44 more rate previews.↓
Point of Contact
Agency & Office
Description
Interior Painting at Central High School. The City of Springfield is seeking bids from qualified firms to enter into an agreement to provide interior painting services at Springfield Public Schools.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Springfield is seeking bids for interior painting services at Central High School, with a response deadline of February 26, 2026. This opportunity is categorized under UNSPSC 72-10-24, focusing on general contractor services, particularly for educational institutions. Interested bidders should review the attached bid documentation for detailed requirements and guidelines.
The buyer aims to secure a qualified contractor for interior painting services at Central High School as part of ensuring a well-maintained educational environment for students and faculty.
- Contractors with experience in educational facility projects
- Companies with capacity for large-scale painting jobs
- Local firms familiar with Springfield regulations
- Review bid documentation in attachment
- Conduct site assessments if necessary
- Prepare bid proposal including pricing and timeline
- Submit bid prior to the deadline
- Completed bid proposal form
- Evidence of past performance on similar projects
- Itemized pricing list for services
- Proof of insurance and licensing
- References from previous clients
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Confirm adherence to local regulations regarding school facilities
- Ensure proper safety protocols are established for work within school areas
- Consider competitive yet realistic pricing based on project scope
- Factor in costs for materials, labor, and potential disruptions to school activities
- Potential to partner with local suppliers for materials
- Consider subcontracting for specialized work such as finishes or repairs
- Potential delays due to school schedule
- Compliance with safety regulations during school hours
- Quality control to meet school standards
- What is the expected timeline for project completion?
- Are there specific color schemes or material requirements?
- Is there a budget cap for the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific details on project scope and dimensions
- Timeline for project completion
- Additional requirements or specifications for the paint
- Local regulations affecting painting work
- Any pre-bid meetings or site visits planned
- Details about available utilities or working hours at the site
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.