Skip to content
City of Somerville

IFB 26-45 Shore Drive Greenway Construction

Solicitation: Not available
Notice ID: ma_commbuys_10bd7f02c54f209e507a
NAICS 72, 14, 00DepartmentCity of SomervilleAgencyCOS01 - Procurement & Contracting ServicesStateMAPostedDueFeb 25, 2026, 02:00 PM UTCExpired

Federal opportunity from COS01 - Procurement & Contracting Services • City of Somerville. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: NAICS 72, 14, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Procurement & Contracting Services Department 93 Highland Ave Somerville, MA 02143 US Email: procurement@somervillema.gov Phone: (617) 625-6600 Ext. 3400
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Somerville
Agency
COS01 - Procurement & Contracting Services
Subagency
COS01 - Procurement & Contracting Services
Office
Felisa Garate
Contracting Office Address
Not available

Description

To obtain bid documents, visit www.somervillema.gov/procurement

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity involves the construction of the Shore Drive Greenway, as outlined in IFB 26-45, managed by the City of Somerville's Procurement & Contracting Services. The bid documents are available online at the Somerville procurement website, with a response deadline set for February 25, 2026. Bidders should prepare to leverage their expertise in greenway construction while being aware of the local regulations and requirements.

greenway constructionmunicipal contractSomervilleinfrastructure improvements
What the buyer is trying to do

The City of Somerville is looking to contract a construction firm to execute the Shore Drive Greenway project, which is expected to enhance local transportation infrastructure and recreational areas.

Who should pursue this
  • Construction firms with experience in greenway or trail projects
  • Firms familiar with municipal contract requirements
  • Local contractors with knowledge of Somerville regulations
Work breakdown
  • Review of bid documents
  • Site assessment and preparation
  • Construction of the greenway
  • Environmental compliance
  • Final inspections and project handover
Response package checklist
  • Completed bid documents
  • Proof of insurance and bonding
  • Past performance references
  • Compliance certifications
  • Pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all local building codes are met
  • Environmental impact assessments may be required
  • Adherence to safety regulations during construction
Pricing strategy
  • Consider competitive pricing while ensuring quality delivery
  • Factor in local cost of materials and labor
  • Evaluate potential cost-sharing or sponsorships
Teaming and subs
  • General contractors could team with local subcontractors for specialized work
  • Engagement with environmental compliance experts
  • Collaboration with local suppliers for materials
Risks and watchouts
  • Potential delays due to environmental regulations
  • Budget overruns from unexpected site conditions
  • Compliance issues with municipal codes
Smart questions to ask
  • What are the specific performance metrics required for the greenway?
  • Are there existing surveys or assessments of the site?
  • What is the preferred timeline for completion and stakeholder approvals?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget for the project
  • Details on required qualifications or past project examples
  • More information on project scope and features
  • Clarification on environmental regulations involved
  • Information on potential funding sources or grants

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.