CONSTRUCTION DPW EQUIPMENT GARAGE
Federal opportunity from PD888 - City of Quincy Purchasing Department • City of Quincy. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS UNSPSC 72-15-40.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-15-40
Description
The City of Quincy, on behalf of the Department of Public Works, invites bidders to submit sealed bids for the construction of a DPW EQUIPMENT GARAGE. The work for this contract includes but is not limited to site preparation, utilities, masonry, foundation work, framing, waterproofing, insulation, painting, and all materials, equipment, and services.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Quincy, through its Department of Public Works, is seeking bidders for the construction of a DPW Equipment Garage. Key components of this project include site preparation, masonry, and other critical construction activities. The response deadline for bids is set for March 12, 2026, providing ample time for potential contractors to prepare their submissions.
The City of Quincy aims to construct a DPW Equipment Garage, providing necessary infrastructure for public works operations.
- Site preparation
- Utilities installation
- Masonry work
- Foundation construction
- Framing erection
- Waterproofing installation
- Insulation application
- Painting
- Provision of all materials, equipment, and services
- Completed bid form
- Certificate of eligibility
- Proof of bonding
- W-9 form
- References from prior projects
- Bid pricing details
- Compliance with local regulations
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location of the project site is not provided
- Information on bonding requirements is missing
- No details on evaluation criteria for bids are specified
- Clarification needed on local permitting processes
- No contact details for the project manager
- There is no timeline for project completion provided
- No details on available budget or funding sources
- Information on existing site conditions not disclosed
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.