IFB #26300064 Casimir Pulaski Elementary Roof Replacement-GC
Federal opportunity from 00138 - Purchasing • City of New Bedford. Place of performance: MA. Response deadline: Mar 11, 2026. Industry: NAICS 25, 17, 41, 30, 15, 16, 72, 10, 26.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
IFB #26300064 Casimir Pulaski Elementary Roof Replacement-GC
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The IFB #26300064 for the Casimir Pulaski Elementary Roof Replacement requires general contractor services. The response deadline is set for March 11, 2026, providing ample time for bidders to prepare. This opportunity is noteworthy due to its focus on essential infrastructure improvement within the educational sector.
The buyer seeks a qualified general contractor to replace the roof at Casimir Pulaski Elementary, ensuring the facility meets current standards and provides a safe environment for students.
- General contractors with experience in school facilities
- Firms specializing in roofing solutions
- Local businesses with a strong reputation in the community
- Site assessment and preparation
- Removal of existing roofing materials
- Installation of new roofing systems
- Final inspection and quality assurance
- Completed bid form
- Proof of insurance and bonding
- References from similar projects
- Detailed project timeline
- Pricing breakdown for materials and labor
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local building codes
- Adhere to safety regulations during construction
- Confirm all materials meet specified standards
- Consider competitive pricing while ensuring quality
- Evaluate cost of materials versus labor
- Include contingencies for unexpected expenses
- Consider partnering with roofing material suppliers
- Engage local labor for subcontracting opportunities
- Leverage previous relationships with architectural firms for insights
- Potential delays due to weather conditions
- Challenges in coordination with school schedules
- Cost overruns if not carefully managed
- What are the preferred roofing materials for this project?
- Are there any specific timing restrictions during the school year?
- What is the budget range allocated for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Location details for the Casimir Pulaski Elementary
- Scope details regarding roofing specifications
- Details on any existing roof conditions
- Information on previous roof replacement projects
- Any warranties or guarantees required
- Specific performance milestones during the project
- Details on preferred contractor qualifications
- Regulatory requirements specific to school facilities
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.