RFQ 2026-28DPW
Federal opportunity from CH015 - Purchasing • City of Holyoke. Place of performance: MA. Response deadline: Mar 24, 2026. Industry: NAICS UNSPSC 81-10-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 81-10-00
Description
The City of Holyoke DPW seeks qualifications from engineering firms to complete the final design and bid-ready construction documents for the River Terrace (CSO-21B) Combined Sewer Separation Project. Work requested includes confirming and updating utility base mapping as previously surveyed against current utility records, potential field investigations to identify and resolve any potential design conflicts with utilities, completion of permitting and design documents
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Holyoke DPW is seeking qualifications from engineering firms for the River Terrace (CSO-21B) Combined Sewer Separation Project. Bidders are expected to provide final design and bid-ready construction documents, which include utility mapping updates and field investigations. This RFQ signifies a crucial opportunity for firms experienced in civil engineering and municipal infrastructure projects.
The buyer aims to engage qualified engineering firms to finalize the design and create construction documents for a key sewer separation project, enhancing the city's infrastructure and addressing utility conflicts.
- Confirm and update utility base mapping against current records
- Conduct potential field investigations for design conflict resolution
- Complete permitting and design documents for construction readiness
- Letter of interest
- Company qualifications and experience
- Relevant project references
- Proposed approach to the project
- Team composition and qualifications
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No posted date provided
- No solicitation number mentioned
- No specific performance period outlined
- No budget constraints specified
- Lack of detail on types of utilities involved
- No information on existing design aspects or constraints
- Unclear number of competing firms expected
- Absence of prior relevant project history
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.