IFB 2026-22DPW LBRP
Federal opportunity from CH015 - Purchasing • City of Holyoke. Place of performance: MA. Response deadline: Mar 03, 2026. Industry: NAICS UNSPSC 46-16-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
furnishing the necessary labor, transportation, tools, equipment, materials, and appurtenances to make traffic signal improvements on Main Street in Holyoke between the intersections of Berkshire St and Sargeant St, including replacement of signage and pavement markings as well other incidental work. The estimated value of this contract, including all bid alternates, is $373,163 The bidder Contractor must be MassDOT, Prequalified in the class of work HIGHWAY CONSTRUCTION or TRAFFIC SIGNALS
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This IFB (2026-22DPW LBRP) from CH015 - Purchasing outlines a project for traffic signal improvements on Main Street in Holyoke. The total contract value, including bid alternates, is estimated at $373,163. Bidders must be prequalified by MassDOT in the areas of Highway Construction or Traffic Signals, ensuring only qualified contractors can participate in this opportunity.
The buyer aims to improve traffic signals on Main Street in Holyoke, specifically between Berkshire St and Sargeant St, enhancing safety and traffic management in the area.
- Labor provision for the construction project
- Transportation of materials and equipment
- Tools and equipment supply
- Replacement of traffic signage
- Pavement markings and other incidental work
- Bid proposal
- Proof of MassDOT prequalification
- Itemized cost estimate
- Schedule of work
- References from similar projects
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific solicitation number provided
- No detailed timeline for the project phases
- No specific requirements for the quality of materials used
- Absence of penalties for delays
- Lack of information on traffic management during construction
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.