Skip to content
City of Framingham

IFB - PW-1248 - On Call Road Rehabilitation

Solicitation: Not available
Notice ID: ma_commbuys_2e18efdbd7c5fb653664
NAICS 72, 14, 10DepartmentCity of FraminghamAgencyTOF01 - PurchasingStateMAPostedDueMar 05, 2026, 10:00 AM UTCExpired

Federal opportunity from TOF01 - Purchasing • City of Framingham. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Jennifer Pratt 150 Concord Street Room #127 Framingham, MA 01702 US Email: jap@framinghamma.gov Phone: (508) 532-5405
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Framingham
Agency
TOF01 - Purchasing
Subagency
TOF01 - Purchasing
Office
Audra Shaw
Contracting Office Address
Not available

Description

The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for the rehabilitation of the asphalt pavement, guardrails, curbs and sidewalks and drainage systems on public roads and/or segments of public roads within the City of Framingham. MASSDOT prequalification of contractors with class of work HIGHWAY CONSTRUCTION will be required.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The City of Framingham is seeking sealed bids for IFB - PW-1248, focused on the rehabilitation of asphalt pavement, guardrails, curbs, sidewalks, and drainage systems on public roads. Bidders must be prequalified under the MASSDOT class of work HIGHWAY CONSTRUCTION. The response deadline is set for March 5, 2026, providing ample time for detailed proposals.

road rehabilitationasphalt pavementMASSDOT prequalificationmunicipal infrastructurepublic works bidding
What the buyer is trying to do

The City aims to restore and improve the infrastructure of its public roads to enhance safety and accessibility for its citizens.

Who should pursue this
  • Contractors prequalified under MASSDOT in HIGHWAY CONSTRUCTION
  • Companies specializing in road rehabilitation and maintenance
  • Firms with prior experience in municipal infrastructure projects
Work breakdown
  • Rehabilitation of asphalt pavement
  • Repairs and installation of guardrails
  • Renovation of curbs and sidewalks
  • Upgrading of drainage systems
  • Work on specified segments of public roads within Framingham
Response package checklist
  • Proof of MASSDOT prequalification
  • Detailed project timeline and milestones
  • Price proposal breakdown
  • Company background and relevant experience
  • References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bids must comply with local municipality regulations
  • Ensure adherence to MASSDOT specifications and standards
Pricing strategy
  • Competitive bidding is expected; consider local competitors' rates
  • Include a comprehensive cost analysis for labor, materials, and overhead
Teaming and subs
  • Consider partnering with local subcontractors for specialized work
  • Engage with suppliers who can provide materials at a competitive rate
Risks and watchouts
  • Potential delays in obtaining necessary permits
  • Weather-related delays impacting asphalt work
  • Bidder capacity to manage community impact during construction
Smart questions to ask
  • What is the total budget allocated for this project?
  • What are the specific timelines for each phase of the work?
  • Are there any anticipated challenges or concerns from the community?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget range provided
  • Lack of details about the total road segments involved
  • No information on existing infrastructure condition
  • Absence of contact person for clarifications
  • No historical data on previous similar contracts
  • Details about community stakes are unclear
  • No information on penalties for late delivery
  • Unspecified funding sources for the project

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.