IFB - PW-1248 - On Call Road Rehabilitation
Federal opportunity from TOF01 - Purchasing • City of Framingham. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS UNSPSC 72-14-10.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-14-10
Description
The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for the rehabilitation of the asphalt pavement, guardrails, curbs and sidewalks and drainage systems on public roads and/or segments of public roads within the City of Framingham. MASSDOT prequalification of contractors with class of work HIGHWAY CONSTRUCTION will be required.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Framingham is seeking sealed bids for IFB - PW-1248, focused on the rehabilitation of asphalt pavement, guardrails, curbs, sidewalks, and drainage systems on public roads. Bidders must be prequalified under the MASSDOT class of work HIGHWAY CONSTRUCTION. The response deadline is set for March 5, 2026, providing ample time for detailed proposals.
The City aims to restore and improve the infrastructure of its public roads to enhance safety and accessibility for its citizens.
- Rehabilitation of asphalt pavement
- Repairs and installation of guardrails
- Renovation of curbs and sidewalks
- Upgrading of drainage systems
- Work on specified segments of public roads within Framingham
- Proof of MASSDOT prequalification
- Detailed project timeline and milestones
- Price proposal breakdown
- Company background and relevant experience
- References from similar projects
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific budget range provided
- Lack of details about the total road segments involved
- No information on existing infrastructure condition
- Absence of contact person for clarifications
- No historical data on previous similar contracts
- Details about community stakes are unclear
- No information on penalties for late delivery
- Unspecified funding sources for the project
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.