Skip to content
City of Framingham

IFB #8943 - Zoll AED's for Police Department

Solicitation: Not available
Notice ID: ma_commbuys_86c75e08f00e2f81ae4a
NAICS 42, 17, 00DepartmentCity of FraminghamAgencyTOF01 - PurchasingStateMAPostedDueFeb 24, 2026, 10:00 AM UTCExpired

Federal opportunity from TOF01 - Purchasing • City of Framingham. Place of performance: MA. Response deadline: Feb 24, 2026. Industry: NAICS 42, 17, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Jennifer Pratt 150 Concord Street Room #127 Framingham, MA 01702 US Email: jap@framinghamma.gov Phone: (508) 532-5405
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Framingham
Agency
TOF01 - Purchasing
Subagency
TOF01 - Purchasing
Office
Audra Shaw
Contracting Office Address
Not available

Description

The City of Framingham, acting through the Mayor, the Awarding Authority is requesting bids for the procurement of seventy new ZOLL AED 3 semi automatic defibrillators and ten ZOLL AED Trainers. The AED units shall include Real CPR Help® technology, one pre-connected Unipadz, a five year smart battery, CPR AED responder kit, starter toolkit, and an eight year warranty.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Framingham is seeking bids for seventy new ZOLL AED 3 semi-automatic defibrillators and ten ZOLL AED Trainers, with a response deadline of February 24, 2026. The AED units must include Real CPR Help® technology, a five-year smart battery, and an eight-year warranty. This procurement represents a significant opportunity for bidders specializing in medical equipment and training supplies.

AED procurementZOLL AED 3defibrillator bidspublic safety equipmentmedical training devices
What the buyer is trying to do

The buyer aims to procure high-quality AEDs and trainers to enhance public safety in the Framingham community.

Who should pursue this
  • Companies specializing in medical emergency equipment
  • Distributors of Zoll products
  • Bidders with experience in supplying public safety equipment
Work breakdown
  • Procure 70 ZOLL AED 3 defibrillators
  • Procure 10 ZOLL AED Trainers
  • Ensure all equipment meets specified requirements and warranty conditions
  • Provide necessary training for users of the AEDs
Response package checklist
  • Completed bid form
  • Specifications compliance documentation
  • Pricing bid for AEDs and trainers
  • Warranty details for the products
  • Training support availability information
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must adhere to specifications detailed in the solicitation
  • All items must meet safety and quality standards for medical devices
Pricing strategy
  • Consider competitive pricing while ensuring quality and compliance with specifications
  • Factor in costs for training and ongoing support
Teaming and subs
  • Partner with training providers for comprehensive support
  • Consider teaming with logistics firms for timely delivery of units
Risks and watchouts
  • Risk of non-compliance with bid specifications leading to disqualification
  • Potential challenges in product availability due to lead times
  • Risk associated with warranty service and support commitments
Smart questions to ask
  • What are the specific warranty conditions for the AED units?
  • Are there any local regulations or certifications required for these devices?
  • What is the expected timeline for procurement and training after contract award?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications document for the AEDs and trainers
  • Information on the intended use or specific training needs for the AED Trainers
  • Clarification on delivery and installation expectations
  • Bid evaluation criteria and weighting
  • Any history of previous contracts for similar equipment by the city

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.