Skip to content
City of Fitchburg

26-079 Gymnasium Floor Replacement

Solicitation: Not available
Notice ID: ma_commbuys_b1559a97a15b5cbdc3d2
DepartmentCity of FitchburgAgencyFtbrg - Procurement DepartmentStateMAPostedDueMar 12, 2026, 11:00 AM UTCExpired

Federal opportunity from FTBRG - PROCUREMENT DEPARTMENT • City of Fitchburg. Place of performance: MA. Response deadline: Mar 12, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,747,914,507
Sector total $2,747,914,507 • Share 100.0%
Live
Median
$345,024
P10–P90
$39,423$2,325,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,747,914,507)
Deal sizing
$345,024 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Mary Delaney 166 Boulder Drive Suite 108 Procurement Department Fitchburg, MA 01420 US Email: mdelaney@fitchburgma.gov Phone: (978) 829-1852 FAX: (978) 829-1970
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260023 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Fitchburg
Agency
FTBRG - PROCUREMENT DEPARTMENT
Subagency
FTBRG - PROCUREMENT DEPARTMENT
Office
Samantha Sauer
Contracting Office Address
Not available

Description

The city of fitchburg is seeking qualified vendors to furnish and install new flooring in the gym. Documents available at www.fitchburgma.gov/bids.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 28, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Fitchburg is initiating a bid for the replacement of gymnasium flooring, as indicated by notice ID ma_commbuys_b1559a97a15b5cbdc3d2. This opportunity calls for qualified vendors to furnish and install new flooring in their gymnasium, with proposals due by March 12, 2026. Interested vendors can find the necessary bidding documents at the specified city website.

gym flooring replacementFitchburg city bidsflooring installation contractors
What the buyer is trying to do

The buyer is seeking qualified vendors to furnish and install new gym flooring, ensuring the replacement meets their specifications and quality standards.

Who should pursue this
  • Flooring contractors with experience in gym installations
  • Businesses with a solid reputation for timely project execution
Work breakdown
  • Furnish gymnasium flooring materials
  • Install gymnasium flooring
  • Quality assurance and inspection of installation
Response package checklist
  • Completed bid proposal
  • Proof of relevant experience
  • Cost proposal
  • Schedule of installation
  • References
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local regulations and building codes may be required
Pricing strategy
  • Consider competitive pricing due to the nature of public bidding processes
Teaming and subs
  • Consider partnering with flooring material suppliers
  • Subcontracting with local installers to enhance responsiveness
Risks and watchouts
  • Potential delays in sourcing materials could impact project timelines
  • Bidders should verify compliance with local government regulations
Smart questions to ask
  • What specific flooring materials are preferred by the city?
  • Are there any existing conditions in the gym that may affect installation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on the specific flooring material requested
  • Exact dimensions of the gymnasium
  • Required completion timeline for installation

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.