Surveillance camera system at two developments and site lighting
Federal opportunity from CHAMD - Chicopee Housing Authority • Chicopee Housing Authority. Place of performance: MA. Response deadline: Apr 08, 2026. Industry: NAICS 72, 11.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
Surveillance camera system at two developments and site lighting
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Chicopee Housing Authority (CHAMD) is seeking a contractor to install a surveillance camera system at two of its developments along with site lighting enhancements. This opportunity could provide significant recurring work in the domain of public housing and safety initiatives. Responses are due by April 8, 2026, allowing ample time for bidders to prepare comprehensive proposals.
CHAMD aims to enhance the security of its housing developments through the installation of a modern surveillance camera system and improved site lighting to ensure safety for residents.
- Companies experienced in security systems installation
- Lighting contractors with public housing experience
- Partners familiar with local building codes and regulations
- Assess current security infrastructure
- Design a surveillance camera system tailored for the developments
- Install surveillance cameras and site lighting
- Perform testing and quality assurance of installed systems
- Provide training for site staff on system operation and maintenance
- Proposal outlining system design and implementation
- Detailed pricing breakdown
- References from previous similar projects
- Timeline for project completion
- Compliance with local regulations for security system installations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local and state security and construction regulations
- Consider HUD guidelines if applicable
- Verify contractor licensure in Massachusetts
- Competitive pricing essential, given the public nature of the contract
- Consider installation and long-term maintenance in the pricing model
- Potential for public funding impact on bid prices
- Local electrical contractors for site lighting installation
- Technology partners specializing in surveillance camera systems
- Subcontractors with experience in public housing projects
- Regulatory hurdles related to public safety and surveillance
- Potential for budget constraints affecting project scope
- Delays in securing necessary permits
- What specific security issues are currently present at the sites?
- What is the budget range allocated for this project?
- Are there existing contracts or systems that need to be integrated?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications of the surveillance system required
- Exact locations of the two developments
- Budget estimate or range for the project
- Specific technical requirements for camera and lighting systems
- Any existing infrastructure that may affect installation
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.