Estimated Construction Cost $1,400,000.00
Federal opportunity from CID01 - Capital Improvements • Brockton Housing Authority. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS UNSPSC 72-13-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-13-00
Description
Installation of generators at eight sites for powering community rooms, replacement of and installation of new automatic transfer switches, mechanical improvements at selected sites, extension of gas service, and site work and improvements to suit the new work. Work will be in occupied spaces. REFER TO WWW.BIDDOCSONLINE.COM FOR ALL PLANS/SPECS/BIDS Filed Sub Trades: Sec 220000; Plumbing and Sec 230000;HVAC/Mechanical. Filed Sub Bid due: 3/18/26 at 11:00AM.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.