Project FAC-01 Repair of Fire Line
Federal opportunity from BCC01 - Bristol Community College • Bristol Community College. Place of performance: MA. Response deadline: Apr 10, 2026. Industry: NAICS 72, 10, 33, 15, 11.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
The underground 8' cast iron (C.I). supply pipe for the fire line is leaking. We have determined that it is leaking between two isolation valves, along a 130 l.f. of pipe. The Contractor shall furnish all labor, materials, equipment, and supervision necessary to excavate, remove, and replace approximately 130 linear feet of existing 8-inch cast iron (C.I.) underground fire service piping, including all appurtenances, in accordance with applicable codes and standards, including NFPA 24.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Bristol Community College requires repair of its underground fire line due to leakage in an 8" cast iron pipe. The project involves replacing approximately 130 linear feet of piping in compliance with NFPA 24 standards. Proposals are due by April 10, 2026, making an opportunistic timeline for qualified contractors to prepare their bids.
The buyer is seeking a contractor who can efficiently remove and replace the leaking portion of the fire line while adhering to necessary safety and code standards.
- Contractors experienced in underground utility work
- Firms with expertise in fire suppression systems
- Companies familiar with NFPA code compliance
- Excavation of existing pipe
- Removal of leaking cast iron pipe
- Installation of new 8-inch cast iron piping
- Connection of all appurtenances
- Compliance with NFPA 24 and local codes
- Company credentials and relevant experience
- Detailed project approach and timeline
- Safety plan and adherence to NFPA 24
- Cost proposal for labor and materials
- References from previous similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with NFPA 24
- Adhere to local building codes and standards
- Consider cost of labor and materials, including excavation and replacement
- Factor in potential delays due to unforeseen site conditions
- Subcontractors with expertise in excavation
- Mechanical contractors specializing in fire suppression systems
- Potential for unexpected soil conditions leading to delays
- Need for additional permits depending on excavation depth
- What are the existing conditions of the surrounding area that might affect excavation?
- Are there specific local codes that apply beyond NFPA 24?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific location of the fire line
- Details on the existing site's conditions
- Expected budget range for the project
- List of required permits or approvals
- Potential for phased work or sequencing requirements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.