Roger Conant (667-6) Paving Project #030128
Federal opportunity from BHA11 - Beverly Housing Authority • Beverly Housing Authority. Place of performance: MA. Response deadline: Mar 13, 2026. Industry: NAICS 72, 14, 11.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
Remove and reconstruct bituminous parking lot, drive aisles, and sidewalks. Construct concrete dumpster pad. Install removeable bollards, wood fence dumpster enclosure. Railings. Pavement markings, loam and hydroseed. install new granite curb, remove and reset granite curb. Signage. Catch basin reconstruction. Other associated site items.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Beverly Housing Authority has issued a solicitation for the Roger Conant Paving Project #030128, focusing on the comprehensive reconstruction of a bituminous parking lot and associated site enhancements. Key deliverables include the construction of a concrete dumpster pad and the installation of various site elements such as railings and pavement markings. Proposals are due by March 13, 2026, and interested parties can access the detailed bid document through the provided link.
The buyer aims to enhance the functionality and safety of the parking lot and adjacent areas through reconstruction and installation of improved site features, ensuring compliance with modern standards.
- Contractors experienced in asphalt and concrete work
- Firms with expertise in site development and landscaping
- Companies that can meet the project timeline and compliance standards
- Remove existing bituminous parking lot
- Reconstruct parking lot and drive aisles
- Install concrete dumpster pad
- Erect removable bollards and wood fence enclosure
- Install railings and signage
- Conduct catch basin reconstruction
- Apply pavement markings and loam with hydroseed
- Remove and reset granite curb and install new granite curb
- Company profile and relevant project experience
- Detailed project plan and timeline
- Proposed pricing structure
- Compliance with local regulations and standards
- Team qualifications and references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Check for compliance with local construction codes
- Ensure adherence to environmental regulations during site work
- Verify safety measures are included in the proposal
- Calculate costs based on material and labor estimates for reconstruction
- Consider competitive pricing while ensuring quality delivery
- Factor in overhead and project management costs
- Consider partnering with local material suppliers for asphalt and concrete
- Subcontract with landscaping firms for loam and hydroseeding
- Engage site safety experts to ensure compliance throughout the project
- Delays in procurement of materials could impact project timeline
- Weather conditions affecting project work schedule
- Potential underestimation of labor requirements
- What are the specific materials preferred for the asphalt and concrete tasks?
- Are there local subcontractors recommended for specific tasks?
- What are the penalties for delay based on the proposed timeline?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget information for the project
- Detailed evaluation criteria for proposals
- Any necessary permits required prior to project commencement
- Information about site access and operational hours
- Clarification on warranty or maintenance requirements post-project
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.