Skip to content
Department of Transportation

Demolition Svc Hopkins Co Parcel 18

Solicitation: Not available
Notice ID: ky_vss__RFB-605-2600000447-3
DepartmentDepartment of TransportationAgencyKYTC Division of PurchasesStateKYPostedMar 19, 2026, 12:00 AM UTCDueApr 01, 2026, 05:30 PM UTCExpired

Federal opportunity from KYTC Division of Purchases • Transportation - Office Of The Secretary. Place of performance: KY. Response deadline: Apr 01, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for KY
Live POP
Place of performance
Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY
State: KY
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
KY20260026 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Kentucky • Lawrence
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $38.05Fringe $30.87
Rate
BOILERMAKER
Base $43.85Fringe $28.44
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
KY20260026 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Lawrence
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $38.05Fringe $30.87
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $37.04Fringe $26.57
+34 more occupation rates in this WD
Davis-Baconstate match
KY20260037 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Adair, Simpson
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
CARPENTER (Includes Form Work, Excludes Acoustical Ceiling Installation)
Base $32.25Fringe $18.09
+33 more occupation rates in this WD
Davis-Baconstate match
KY20260085 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Henry, Spencer, Trimble
Rate
CARPENTER (Form Work Only)
Base $33.89Fringe $24.06
Rate
ELECTRICIAN
Base $40.96Fringe $22.44
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
+21 more occupation rates in this WD
Davis-Baconstate match
KY20260011 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Boyd, Greenup
Rate
POWER EQUIPMENT OPERATOR: Cable crane (50 tons and over); hydraulic crane (100 tons and over)
Base $36.25Fringe $17.85
Rate
Crane (All other types), truck crane, tower crane (French, German and other types)
Base $35.34Fringe $17.85
Rate
PLUMBER
Base $42.75Fringe $25.76
+14 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Transportation - Office Of The Secretary
Agency
KYTC Division of Purchases
Subagency
KYTC Division of Purchases
Office
Jennifer Houchin | Jennifer.Houchin@ky.gov | 502-782-3977
Contracting Office Address
Not available

Description

Demolition Svc Hopkins Co P18 ***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site (updated).pdf. Please enter contact person, phone number and email in the Comments Section. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Vendors shall submit bid pricing in table provided in Section 1.00. All phases of work required to complete this project shall be included in the cost. NOTE TO CONTRACTOR A mandatory onsite prebid meeting will NOT be held to discuss these parcels. It shall be the responsibility of prospective bidders to inspect and investigate improvements prior to submitting proposals to determine pertinent factors such as access, zoning, easements, condition of improvements, etc. The submission of a proposal will be construed as evidence that inspections and investigations have been made. Later claims for such items which could have been foreseen had inspections/investigations been made shall not be recognized. Please contact Jennifer Cox at (270) 584-3362 for directions to the location.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.