RFB-249-26 DJJ-Campbell Chiller Replacement
Federal opportunity from FIN - DECA • Facilities & Support Services. Place of performance: KY. Response deadline: May 28, 2026.
- Source
- Open on official portal →
- Solicitation
- ky_vss__RFB-785-2600000566-1
- Performance
- Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY
- Response
- May 28, 2026, 05:30 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 34 more rate previews.↓
Description
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. The Chiller and Chilled Water System of the CAMPBELL CO YDC Facility will be removed and replaced per the International Mechanical Code, ASHRAE, Kentucky Building Code with Current Revisions, Americans with Disabilities Act, International Building Code, and National Electrical Code. The Contractor shall remove and take ownership of the existing chiller. The contractor shall disconnect the existing chiller from power and control and, disconnect the existing chiller from piping and mounting. Remove the existing chiller from its installed location and make the location ready for the new chiller described in the following. Make legal and lawful disposal of the chiller, which involves recycling of the unit beginning with refrigerant recovery and dismantling of the assembly for recycling or other appropriate disposition. The Contractor shall provide a temporary Chiller while the existing Chiller is removed and a new Chiller including the Microprocessor controlled, multiple-scroll compressor, air-cooled, chiller of the scheduled capacities as shown and indicated on the Drawings, including but not limited to: chiller package, electrical power and control connections, and chilled water connections. The Owners preferred daily work schedule shall be Monday-Friday 8 hour/day. There are no Contractor working days on Saturday-Sunday. A 48 hour notification is required for any outage of any existing utility including the Chilled Water and Heating Water Systems. Any damaged utility by the Contractor must be put back into service immediately.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.