Skip to content
Facilities & Support Services

RFB-207-26 KSP KEWS Tower New Shelter

Solicitation: Not available
Notice ID: ky_vss__RFB-785-2600000400-2
DepartmentFacilities & Support ServicesAgencyFinance Facilities/Support SvcStateKYPostedMar 04, 2026, 12:00 AM UTCDueMar 12, 2026, 05:30 PM UTCCloses in 6 days

Federal opportunity from Finance Facilities/Support Svc • Facilities & Support Services. Place of performance: KY. Response deadline: Mar 12, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,916,539,917
Sector total $1,916,539,917 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,530$2,497,319
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,916,539,917)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for KY
Live POP
Place of performance
Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY
State: KY
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
KY20260024 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Kentucky • Hopkins
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.00Fringe $20.89
Rate
BOILERMAKER
Base $43.85Fringe $28.44
+34 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 34 more rate previews.
Davis-BaconBest fitstate match
KY20260024 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Hopkins
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.00Fringe $20.89
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
BRICKLAYER
Base $33.70Fringe $16.57
+33 more occupation rates in this WD
Davis-Baconstate match
KY20260079 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Warren
Rate
CARPENTER (Form Work Only)
Base $33.89Fringe $24.06
Rate
ELECTRICIAN
Base $37.10Fringe $8.60
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
+18 more occupation rates in this WD
Davis-Baconstate match
KY20260068 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Edmonson
Rate
CARPENTER (Form Work Only)
Base $33.89Fringe $24.06
Rate
ELECTRICIAN
Base $37.10Fringe $8.60
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
+18 more occupation rates in this WD
Davis-Baconstate match
KY20260082 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Bourbon, Clark, Fayette +3
Rate
ELECTRICIAN
Base $40.96Fringe $22.44
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
Rate
GROUP 2
Base $38.69Fringe $19.60
+17 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Facilities & Support Services
Agency
Finance Facilities/Support Svc
Subagency
Finance Facilities/Support Svc
Office
Susan Ward | Susan.Ward@ky.gov | 502-226-0335
Contracting Office Address
Not available

Description

***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** This project involves site preparation and restoration, shelter replacement, and equipment relocation at selected locations across the Commonwealth. At most sites, existing fiberglass shelters will be replaced with new concrete pre-cast Fibrebond shelters and all equipment moved from the old to the new shelter. Refer to the construction drawings for site-specific upgrades and modifications including site expansion, new generators, new propane tanks, and relocation of existing site components.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.