RFB-189-26 EDU - FFA LTC Public Bathroom Facility ADA Access
Federal opportunity from FIN - DECA • Facilities & Support Services. Place of performance: KY. Response deadline: Mar 05, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Incumbent & Expiration Tracking
Competitive Heat Score
Competition likely above baseline. Prioritize compliance speed and win themes early.
- Deadline pressure: Closes in 6 days.
- Competition pool: Open competition (no set-aside detected).
Point of Contact
Agency & Office
Description
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** The project is to freestanding public bathroom facility at the FFA Leadership Training Camp in Hardinsburg, KY. All four bathrooms will be ADA accessible. The building will be constructed of wood framed walls w/ pre-engineered wood trusses, on concrete slab, with 8 CMU foundation walls, on reinforced concrete footing. Exterior items include: concrete sidewalks, vinyl hopper windows w/ obscure glass & screens, prefinished metal board & batten siding, prefinished metal soffit panels, and asphalt-shingled roof (hip). Interior items include: epoxy flooring, extruded vinyl trim, ADA grab bars, SS toilet accessories, & prefinished metal fluted, siding on walls & ceiling. All wall cavities and bottom-side of roof will be insulated with spray foam. New insulated inward swinging doors w/ privacy hardware. Prefinished metal board & batten style metal wall panels (2 colors) on metal zee furring w/ rigid poly-iso insulation. 5-0w concrete sidewalks will be placed around full perimeter of bathroom facility and extend to existing adjacent walk. Building will only be heated and ventilated only. Exhaust ventilation will exit through the roof. Heat will be ceiling mounted electric units. Each bathroom contains a toilet (tank-type) and ADA accessible sink. Water supply shall come from adjacent swimming pool. Sanitary sewer shall be connected to manhole at the bottom of the hill to the rear of the bathroom facility. Electric will include interior and exterior light fixtures. Electric power shall come from adjacent transformer and panel box.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.