Skip to content
THA - Toll Highway Authority

Change Order Notice PSB 18-1 RR-18-9015 Document and Process Control Mgmt Services

Solicitation: Not available
Notice ID: 26-557THA-ENGCO-B-50330

Federal opportunity from ENGCONSTRUCT557 - Engineering - Construction • THA - Toll Highway Authority. Place of performance: IL. Response deadline: Dec 26, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Ship To - CA 2700 Ogden Avenue Central Administration Downers Grove, IL 60515 US Email: Phone: (630) 241-6800
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
THA - Toll Highway Authority
Agency
ENGCONSTRUCT557 - Engineering - Construction
Subagency
ENGCONSTRUCT557 - Engineering - Construction
Office
AF001 - Engineering - Construction
Contracting Office Address
Not available

Description

Change Order Notice PSB 18-1 RR-18-9015 Document and Process Control Mgmt Services 1st Amendment: This is not a solicitation. See Items Tab for details Item # 1: ( 920 - 39 ) 1st Amendment: This is not a solicitation. Contract RR-18-9015 was originally procured via Professional Services Bulletin (PSB 18-1) and IPB number 22041941. The contract was awarded to Bush Infotech Group, Inc. DBA Kristine Fallon Associates on May 24, 2018 via board resolution 21574. Notice to Proceed was issued on July 2, 2018 with a contract expiration date of December 31, 2025. The amendment extends the completion date of the contract to allow for completion of current tasks and transition to a new vendor. No additional funds are required. 1st Amendment: This is not a solicitation. Contract RR-18-9015 was originally procured via Professional Services Bulletin (PSB 18-1) and IPB number 22041941. The contract was awarded to Bush Infotech Group, Inc. DBA Kristine Fallon Associates on May 24, 2018 via board resolution 21574. Notice to Proceed was issued on July 2, 2018 with a contract expiration date of December 31, 2025. The amendment extends the completion date of the contract to allow for completion of current tasks and transition to a new vendor. No additional funds are required.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.