Skip to content
MIL - Military Affairs

Rebid MIL-Macomb Boiler Replacement-SE

Solicitation: Not available
Notice ID: 25-466MIL-PROCU-B-44090

Federal opportunity from ARNFFCLTIES466 - ARNG Facilities • MIL - Military Affairs. Place of performance: IL. Response deadline: Aug 29, 2024.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Facility Manager 135 West Grant Street Macomb , IL 61455-2971 US Email: ron.a.jeanblanc.nfg@army.mil Phone: (309) 567-4218
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
MIL - Military Affairs
Agency
ARNFFCLTIES466 - ARNG Facilities
Subagency
ARNFFCLTIES466 - ARNG Facilities
Office
AB001 - ARNG Facilities
Contracting Office Address
Not available

Description

Rebid MIL-Macomb Boiler Replacement-SE Rebid-Macomb Boiler Replacement Item # 1: The Dept of Military Affairs, Macomb Readiness Center, located at 135 West Grant Street, Macomb , IL 61455, requires a vendor to provide all labor and materials to replace two (2) boilers to restore hot water and heat to the facility. The Dept of Military Affairs, Macomb Readiness Center, located at 135 West Grant Street, Macomb , IL 61455, requires a vendor to provide all labor and materials to replace two (2) boilers to restore hot water and heat to the facility. Item # 2: ( 910 - 36 ) Labor rate per hour to replace boilers Labor rate per hour to replace boilers Item # 3: ( 910 - 36 ) Total cost to replace 2 each boilers, materials and equipment. Total cost to replace 2 each boilers, materials and equipment. Item # 4: ( 910 - 36 ) Cost per visit for two additional visits after installation for occupancy adjustments to include labor and any materials required.. Cost per visit for two additional visits after installation for occupancy adjustments to include labor and any materials required..

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.