FY24-173 Multi-Year Integrated Grid Plan workshop facilitator
Federal opportunity from ICCSPGLD524 - Illinois Commerce Commission - Springfield Office • ICC - Illinois Commerce Commission. Place of performance: IL. Response deadline: May 29, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
FY24-173 Multi-Year Integrated Grid Plan workshop facilitator Multi-Year Integrated Grid Plan workshop facilitator for workshops to be held beginning April 2025. Please read attached Mandatory Vendor Requirements and Specific Work Requirements for details. Item # 1: ( 918 - 97 ) Prepare, conduct, and facilitate MYIGP workshops on a hybrid (i.e., virtual and in-person) platform with diverse stakeholders and in coordination with assigned ICC Staff and ICC Project Manager. Vendors should provide pricing based on at least 6 virtual workshops to be conducted from April 2025 through August 2025. This is an estimated amount/time and ICC may hold greater or fewer workshops over the course of the contract term. (Please see attached Mandatory Vendor Requirements and Specific Work Requirements) Prepare, conduct, and facilitate MYIGP workshops on a hybrid (i.e., virtual and in-person) platform with diverse stakeholders and in coordination with assigned ICC Staff and ICC Project Manager. Vendors should provide pricing based on at least 6 virtual workshops to be conducted from April 2025 through August 2025. This is an estimated amount/time and ICC may hold greater or fewer workshops over the course of the contract term. (Please see attached Mandatory Vendor Requirements and Specific Work Requirements) Item # 2: ( 918 - 97 ) Prepare periodic reports summarizing workshop results to ICC Project Manager (Please see attached Mandatory Vendor Requirements and Specific Work Requirements). Prepare periodic reports summarizing workshop results to ICC Project Manager (Please see attached Mandatory Vendor Requirements and Specific Work Requirements). Item # 3: ( 918 - 97 ) Schedule and hold periodic virtual meetings with ICC Project Manager (Please see attached Mandatory Vendor Requirements and Specific Work Requirements Schedule and hold periodic virtual meetings with ICC Project Manager (Please see attached Mandatory Vendor Requirements and Specific Work Requirements
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.