REBID Hanley Auditorium HVAC/Electrical Work FY26
Federal opportunity from FINADMIN494 - Finance & Administration • DOT - Transportation. Place of performance: IL. Response deadline: Jan 21, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
REBID Hanley Auditorium HVAC/Electrical Work FY26 Agency is seeking HVAC/Electrical Work at the Hanley Auditorium. This procurement is for Small Business Set Aside Program vendors only. Item # 1: ( 910 - 36 ) General worker (straight time) for installation, modifying and on-site customer training General worker (straight time) for installation, modifying and on-site customer training Item # 2: ( 910 - 36 ) Carrier air cooled 38RCD0306HA1D184 30-ton unit to match existing AHU. Carrier air cooled 38RCD0306HA1D184 30-ton unit to match existing AHU. Item # 8: ( 910 - 36 ) Vendor supplied equipment, materials, and installation/Hoisting (Crane). Vendor supplied equipment, materials, and installation/Hoisting (Crane). Item # 5: Provide and install 460 3 phase DX air cooled condensing unit for existing AHU. Provide elevated steel structure for condensing unit to sit on. Provide all electrical connections and material from start of project to completion of project. Provide all electrical connections from MCC to the outside unit and all low voltage control wiring from outside unit to the air handler and the operational building automation program. Modify/install drain piping as required for coil installation. Provide and install all required refrigeration specialties. Provide all refrigerant piping and insulation as required. Provide and install 460 3 phase DX air cooled condensing unit for existing AHU. Provide elevated steel structure for condensing unit to sit on. Provide all electrical connections and material from start of project to completion of project. Provide all electrical connections from MCC to the outside unit and all low voltage control wiring from outside unit to the air handler and the operational building automation program. Modify/install drain piping as required for coil installation. Provide and install all required refrigeration specialties. Provide all refrigerant piping and insulation as required. Item # 6: Vendor will be required to provide all trucking and hoisting (crane). Provide all rigging and hoisting as well as crane or truck to place unit. (Must stay off concrete approach by the air well) Vendor will be required to provide all trucking and hoisting (crane). Provide all rigging and hoisting as well as crane or truck to place unit. (Must stay off concrete approach by the air well)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.