REBID D1 Boat Operator and Bucket Board Rental FY26
Federal opportunity from FINADMIN494 - Finance & Administration • DOT - Transportation. Place of performance: IL. Response deadline: Feb 18, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
REBID D1 Boat Operator and Bucket Board Rental FY26 IDOT District 1 seeks a boat operator. There is a BEP goal of 3%. Item # 1: ( 975 - 35 ) YEAR 1 Bucket Boat Operator - Straight Time - Monday thru Friday - 6:30 a.m. to 3:00 p.m. (CST) YEAR 1 Bucket Boat Operator - Straight Time - Monday thru Friday - 6:30 a.m. to 3:00 p.m. (CST) Item # 2: ( 975 - 35 ) YEAR 1 Bucket Boat Operator - Over Time - Monday thru Friday 3:00 p.m. to 7:00 p.m. (CST) or Saturday 6:30 a.m. to 3:00 p.m. (CST) YEAR 1 Bucket Boat Operator - Over Time - Monday thru Friday 3:00 p.m. to 7:00 p.m. (CST) or Saturday 6:30 a.m. to 3:00 p.m. (CST) Item # 3: ( 975 - 21 ) YEAR 1 BOAT RENTAL WITH LIFT: including travel time, tolls, fuel, overnight costs, liability insurance, personal flotation devices, transportation costs, permits, docking fees, and any other costs YEAR 1 BOAT RENTAL WITH LIFT: including travel time, tolls, fuel, overnight costs, liability insurance, personal flotation devices, transportation costs, permits, docking fees, and any other costs Item # 4: ( 975 - 21 ) YEAR 1 MOBILIZATION IN AND OUT: includes each occurrence to mobilize all equipment to the project site and returning to the dock; includes daily rate for loading and unloading equipment, and the use of pneumatic grinder and chisels, and 250 CFM / 100 PSI portable air compressor. YEAR 1 MOBILIZATION IN AND OUT: includes each occurrence to mobilize all equipment to the project site and returning to the dock; includes daily rate for loading and unloading equipment, and the use of pneumatic grinder and chisels, and 250 CFM / 100 PSI portable air compressor. Item # 5: ( 975 - 35 ) YEAR 2 Bucket Boat Operator - Straight Time - Monday thru Friday - 6:30 a.m. to 3:00 p.m. (CST YEAR 2 Bucket Boat Operator - Straight Time - Monday thru Friday - 6:30 a.m. to 3:00 p.m. (CST
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.