Skip to content
DNR - Natural Resources

AML 2305 Buwick Dam

Solicitation: Not available
Notice ID: 26-422DNR-MINES-B-50951

Federal opportunity from MINESMINERALS422 - Office of Mines and Minerals • DNR - Natural Resources. Place of performance: IL. Response deadline: Mar 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$247,536,703
Sector total $247,536,703 • Share 100.0%
Live
Median
$178,459
P10–P90
$34,174$656,980
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($247,536,703)
Deal sizing
$178,459 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
DNR-Office of Mines and Minerals One Natural Resources Way Springfield, IL 62702 US Email: noreply@illinois.gov Phone: (217) 782-6302
State: IL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
IL20260002 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
+182 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 182 more rate previews.
Davis-BaconBest fitstate match
IL20260002 (Rev 3)
Open WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
Rate
Fire Stop Technician
Base $44.02Fringe $32.76
+181 more occupation rates in this WD
Davis-Baconstate match
IL20260066 (Rev 2)
Open WD
Published Jan 16, 2026Illinois • Gallatin, Hardin, Pope
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+8 more occupation rates in this WD
Davis-Baconstate match
IL20260024 (Rev 2)
Open WD
Published Jan 16, 2026Illinois • Williamson
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD
Davis-Baconstate match
IL20260037 (Rev 1)
Open WD
Published Jan 16, 2026Illinois • Union
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
DNR - Natural Resources
Agency
MINESMINERALS422 - Office of Mines and Minerals
Subagency
MINESMINERALS422 - Office of Mines and Minerals
Office
AD001 - Abandoned Mined Lands Reclamation Division
Contracting Office Address
Not available

Description

AML 2305 Buwick Dam The project includes modifications to both the main dam and saddle dam. Modifications generally include improvements to bring the dams into compliance with current regulatory standards. Item # 1: ( 912 - 23 ) STONE RIPRAP, CLASS A3 STONE RIPRAP, CLASS A3 Item # 2: ( 912 - 23 ) STONE RIPRAP, CLASS A4 STONE RIPRAP, CLASS A4 Item # 3: ( 988 - 14 ) FILTER FABRIC FILTER FABRIC Item # 4: ( 912 - 23 ) AGGREGATE BASE COURSE, TYPE A 8" SQ YD AGGREGATE BASE COURSE, TYPE A 8" SQ YD MOBILIZATION

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.