QBS-Universally Accessible State Park Site Evaluations
Federal opportunity from REALTYCAPPLAN422 - Office of Realty and Capital Planning • DNR - Natural Resources. Place of performance: IL. Response deadline: Apr 10, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
QBS-Universally Accessible State Park Site Evaluations Professional services are required to complete site evaluations, preliminary schematic designs for site infrastructure and accessible features, preliminary opinions of probable costs, along with other planning documentation for five IDNR sites located throughout the State of Illinois. Offerors must be listed as a prequalified contractor with the Illinois Capital Development Board as an Architect - Engineer at the time of SOI submission. Item # 1: ( 907 - 35 ) Professional services are required to complete site evaluations, preliminary schematic designs for site infrastructure and accessible features, preliminary opinions of probable costs, along with other planning documentation for five IDNR sites located throughout the State of Illinois. Specific locations for evaluation have not been determined by IDNR at this time. Offerors must be listed as a prequalified contractor with the Illinois Capital Development Board as an Architect - Engineer at the time of SOI submission. Professional services are required to complete site evaluations, preliminary schematic designs for site infrastructure and accessible features, preliminary opinions of probable costs, along with other planning documentation for five IDNR sites located throughout the State of Illinois. Specific locations for evaluation have not been determined by IDNR at this time. Offerors must be listed as a prequalified contractor with the Illinois Capital Development Board as an Architect - Engineer at the time of SOI submission.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.