ISD SP PIF - Replace Exterior Loading Dock Doors
Federal opportunity from ISDISVI444 - ISD/ISVI • DHS - Human Services. Place of performance: IL. Response deadline: Jan 08, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ISD SP PIF - Replace Exterior Loading Dock Doors The Illinois School for the Deaf located at 125 S. Webster Ave., Jacksonville, Il, is seeking a vendor to replace exterior loading dock doors at Wait, Horner, and Officer Hall on the ISD campus. The project needs to be completed by 06/30/2026. Item # 1: ( 910 - 14 ) ISD is seeking bidders to remove and replace the exterior loading dock doors at Wait, Horner, and Officer Hall. Bidders Must: Remove and dispose of existing steel exterior doors/frames on the loading dock area of the 3 buildings. Doors are currently set up with handicap hardware w/motorized openers to remain and attach to new doors. All new doors are to be steel with a 24X30 1/4" tempered glass, mortise lockset, and continuous hinge. Using agency utilizes the Best Series 7 lock, so lockset would need to be compatible. Stainless steel hardware is preferred. Remove daily and upon completion of the job all trash and construction debris. Ensure proper security of door opening at all times. Current door opening is approx 76 1/4" x 100 3/4". Upon completion of the install verify proper operation of the automatic door. ISD is seeking bidders to remove and replace the exterior loading dock doors at Wait, Horner, and Officer Hall. Bidders Must: Remove and dispose of existing steel exterior doors/frames on the loading dock area of the 3 buildings. Doors are currently set up with handicap hardware w/motorized openers to remain and attach to new doors. All new doors are to be steel with a 24X30 1/4" tempered glass, mortise lockset, and continuous hinge. Using agency utilizes the Best Series 7 lock, so lockset would need to be compatible. Stainless steel hardware is preferred. Remove daily and upon completion of the job all trash and construction debris. Ensure proper security of door opening at all times. Current door opening is approx 76 1/4" x 100 3/4". Upon completion of the install verify proper operation of the automatic door.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.