Bid Package 8 Plant 3 Construction
Federal opportunity from Archer Western Construction. Place of performance: TX. Response deadline: Mar 17, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 24 more rate previews.↓
Point of Contact
Agency & Office
Description
Work Package 8 for the Lake Belton Water Treatment Plant Expansion and Improvement Project includes but is not limited to the following. Construction for Plant 3, including civil site work (excavation, aggregate base courses, asphalt paving, and chain-link fencing), structural work (rapid mix basins, flocculation basins, and a metering vault), mechanical work (vertical shaft flocculators, inclined plate settlers, a hose less cable vacuum-driven sludge collector system, and associated utility piping. Electrical demolition and electrical & instrumentation scope is included in the drawing set for reference and coordination but is not included in Bid Package 8 (including removals as required, plus low- and medium-voltage distribution such as pad-mounted transformers, switchgear, MCCs, and process control cabling) to be performed under and coordinated through the CMAR and with the Bid Package 6 electrical contractor.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.