Skip to content
Archer Western Construction

Bid Package 8 Plant 3 Construction

Solicitation: 225157-08
Notice ID: fac0ba488a900a2683a05ef0de94e59d
DepartmentArcher Western ConstructionStateTXPostedJan 30, 2026, 12:00 AM UTCDueMar 17, 2026, 12:00 AM UTCCloses in 4 days

Federal opportunity from Archer Western Construction. Place of performance: TX. Response deadline: Mar 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
TX, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TX20260216 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
TX20260216 (Rev 1)
Open WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
+23 more occupation rates in this WD
Davis-Baconstate match
TX20260138 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Fannin
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER (Reinforcing)
Base $29.64Fringe $8.43
+21 more occupation rates in this WD
Davis-Baconstate match
TX20260072 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Cooke
Rate
CEMENT MASON/CONCRETE FINISHER
Base $13.00Fringe $0.00
Rate
LABORER: Common or General
Base $8.06Fringe $0.00
Rate
LABORER: Pipelayer
Base $8.50Fringe $0.00
+4 more occupation rates in this WD
Davis-Baconstate match
TX20260011 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Bexar, Comal, Guadalupe
Rate
Air Conditioning Mechanic
Base $7.25Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $7.46Fringe $0.00
Rate
ELECTRICIAN
Base $9.66Fringe $0.00
+2 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Archer Western Construction
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Work Package 8 for the Lake Belton Water Treatment Plant Expansion and Improvement Project includes but is not limited to the following. Construction for Plant 3, including civil site work (excavation, aggregate base courses, asphalt paving, and chain-link fencing), structural work (rapid mix basins, flocculation basins, and a metering vault), mechanical work (vertical shaft flocculators, inclined plate settlers, a hose less cable vacuum-driven sludge collector system, and associated utility piping. Electrical demolition and electrical & instrumentation scope is included in the drawing set for reference and coordination but is not included in Bid Package 8 (including removals as required, plus low- and medium-voltage distribution such as pad-mounted transformers, switchgear, MCCs, and process control cabling) to be performed under and coordinated through the CMAR and with the Bid Package 6 electrical contractor.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.