Skip to content
CT State Colleges & Universities

Wheaton & Snow Hall Bathroom Renovations

Solicitation: Not available
Notice ID: f9e8183b4bfb34734aae7926dc8d2ca0
DepartmentCT State Colleges & UniversitiesAgencyState of CT - DAS ProcurementStateCTPostedFeb 05, 2026, 12:00 AM UTCDueJan 13, 2026, 07:03 PM UTCExpired

Federal opportunity from State of CT - DAS Procurement • CT State Colleges & Universities. Place of performance: CT. Response deadline: Jan 13, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for CT
Live POP
Place of performance
Hartford, CT
State: CT
Contracting office
450 Columbus Boulevard, Suite 1202 • Hartford, CT • 06103 United States

Point of Contact

Name
Stephen Burke
Email
SBurke@commnet.edu
Phone
8607230304

Agency & Office

Department
CT State Colleges & Universities
Agency
State of CT - DAS Procurement
Subagency
State of CT - DAS Procurement
Office
CTsource / DAS Procurement
Contracting Office Address
450 Columbus Boulevard, Suite 1202
Hartford, CT
06103 United States

Description

Abatement and demolition of existing finishes, HVAC, electrical, and plumbing fixtures in eight gang restrooms and installation of all new finishes, HVAC, electrical and plumbing fixtures for the eight gang restrooms. The restrooms are in two separate buildings, Wheaton and Snow Hall. Each building has two restrooms per floor, (2 floors) totaling 4 restrooms each. The layouts are identical on both floors and both buildings. The contractor shall begin the work on the second-floor restrooms in both Wheaton and Snow Halls simultaneously. This will leave the first-floor restrooms available for use by faculty and staff that work in the buildings over the summer. Once the second-floor restrooms are complete and Certificate of Occupancy is issued by OSBI, work shall commence on the first-floor restrooms.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.