J--ANNUAL CRANE INSPECTIONS
Solicitation from BUREAU OF RECLAMATION • INTERIOR, DEPARTMENT OF THE. Place of performance: CA. Response deadline: Feb 27, 2026. Industry: NAICS 811310 • PSC J039.
Market snapshot
Awarded-market signal for NAICS 811310 (last 12 months), benchmarked to sector 81.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 811310
Description
1. Inspection Frequency ¿ Are all listed crane assets strictly annual inspections, or do any require semi-annual or additional inspections during the performance period?
See attached Crane inspection policy for Northern California Area Office. Also see attached proposed schedule for crane inspections in 2026. We need to stagger the inspections to align with our maintenance and frequent inspection schedule
We perform the following inspections
Daily: Every time crane is used. This is done by Crane Operator (Plant Mech)
Frequent: Every 6 months. This aligns with our yearly Preventive Maintenance done on Crane. This is done by inhouse Plant Mech
Annual Inspection: This includes the same inspections done per frequent inspections plus any other standard inspections the third-party inspector normally performs. This work is done by Third Party crane inspection. The BOR will provide a Plant Mech to support third party crane inspector. The plant mech can operate the crane as needed for the inspector.
2. Access / Lift Requirements ¿ For cranes requiring elevated access, will the Government provide lifts or scaffolding, or should the contractor include lift equipment and associated costs in their pricing?
The contractor is required to provide Lifts as needed to perform the necessary annual third-party crane inspections. This is called out in section
2.02 WORK TO BE PERFORMED A. Contractor shall provide all labor, tools, special tools, man lifts, safety equipment and consumable materials including cleaning products, spray lubricants. and grease as required to complete the work.
3. SMC Mobile Crane Scope ¿ Please confirm the scope and inspection frequency for the SMC Mobile Crane and whether it follows the same annual schedule as the fixed crane assets.
Yes same inspection requirements. One third party inspection per year
4. Facility Locations ¿ Could you please provide the full physical addresses (or confirmed locations) for each listed facility to ensure accurate travel and mobilization pricing?
See attached spreadsheet with addresses
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.