Z2DA--Upgrade Electrical Infrastructure 581-22-102 Huntington VAMC
Federal opportunity from VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: MD. Response deadline: Apr 29, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 84 more rate previews.↓
Point of Contact
Agency & Office
Description
Upgrade Electrical Infrastructure Project 581-22-102 The Department of Veterans Affairs (VA), Hershel Woody Williams Veterans Affairs Medical Center (VAMC) Huntington, WV intends to issue an Request for Proposal (RFP) to award a single, firm fixed price contract for Construction Services. This project consists of the contractor providing all labor, materials, equipment, permits, transportation, and supervision necessary for the construction services for Project Number 581-22-102 Upgrade Electrical Infrastructure at the VA Medical Center in Huntington, WV 25704 in accordance with the solicitation documents. Performance period is 1830 calendar days from receipt of the Notice to Proceed. The solicitation, specifications, drawings, and a...
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.