Skip to content
City of Sherman

Bid IFB #PROD-IFB9003-26 - Fluorosilicic Acid

Solicitation: PROD-IFB9003-26
Notice ID: f722f49af8b503799e1c6078e66036ef
DepartmentCity of ShermanStateTXPostedMar 03, 2026, 12:00 AM UTCDueMar 18, 2026, 12:00 AM UTCCloses in 5 days

Federal opportunity from City of Sherman. Place of performance: TX. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$742,343,447
Sector total $742,343,447 • Share 100.0%
Live
Median
$229,872
P10–P90
$26,965$2,330,661
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($742,343,447)
Deal sizing
$229,872 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
TX, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TX20260216 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
+24 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 24 more rate previews.
Davis-BaconBest fitstate match
TX20260216 (Rev 1)
Open WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
+23 more occupation rates in this WD
Davis-Baconstate match
TX20260137 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Falls
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
CARPENTER (Form Work Only)
Base $33.27Fringe $9.73
+22 more occupation rates in this WD
Davis-Baconstate match
TX20260168 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Marion
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
Boilermaker
Base $33.17Fringe $24.92
Rate
IRONWORKER, REINFORCING
Base $28.26Fringe $8.13
+21 more occupation rates in this WD
Davis-Baconstate match
TX20260138 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Fannin
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER (Reinforcing)
Base $29.64Fringe $8.43
+21 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Sherman
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

This specification covers fluorosilicic acid for water supply service applications. The concentration of fluorosilicic acid shall be 24 wt% and be ANSI/NSF Standard 60 approved. Fluorosilicic acid shall be delivered in 4000-gallon bulk shipments. Packaging and shipment shall conform to all applicable Federal, State, and Local laws and regulations.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.