Skip to content
City of Kingsland

Laurel Island (AA) Pump Station Upgrades and New Sewer Force Main

Solicitation: Not available
Notice ID: f50f900ca8a73f053bd9de2859e27bf3
DepartmentCity of KingslandStateGAPostedMar 06, 2026, 12:00 AM UTCDueApr 09, 2026, 05:30 PM UTCCloses in 34 days

Federal opportunity from City of Kingsland. Place of performance: GA. Response deadline: Apr 09, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,916,539,917
Sector total $1,916,539,917 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,530$2,497,319
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,916,539,917)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for GA
Live POP
Place of performance
Kingsland, GA
State: GA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
GA20260303 (Rev 0)
Match signal: state matchOpen WD
Published Jan 23, 2026Georgia • Clayton
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.90Fringe $18.80
Rate
MILLWRIGHT
Base $31.58Fringe $17.05
+26 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 26 more rate previews.
Davis-BaconBest fitstate match
GA20260303 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Clayton
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.90Fringe $18.80
Rate
MILLWRIGHT
Base $31.58Fringe $17.05
Rate
OPERATOR: Backhoe/Excavator/Trackhoe
Base $28.32Fringe $13.45
+25 more occupation rates in this WD
Davis-Baconstate match
GA20260319 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Catoosa, Dade, Walker
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATOR: Crane
Base $38.53Fringe $16.08
+19 more occupation rates in this WD
Davis-Baconstate match
GA20260324 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Murray, Whitfield
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATOR: Crane
Base $38.53Fringe $16.08
+19 more occupation rates in this WD
Davis-Baconstate match
GA20260085 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Ben Hill
Rate
BOILERMAKER
Base $34.21Fringe $23.92
Rate
POWER EQUIPMENT OPERATOR: Crane (over 10 tons)
Base $32.00Fringe $17.70
Rate
Crane (over 120 tons)
Base $33.00Fringe $17.70
+18 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Kingsland
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Laurel Island (AA) Pump Station Upgrades and New Sewer Force Main

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.