Custer Gallatin NF Fairy Lake Phase 2 Road & Recreation I...
Federal opportunity from Public Agency. Place of performance: United States.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
The USDA Forest Service plans to issue a solicitation for improvements to Fairy Lake Road #74 and associated recreation infrastructure on the Custer Gallatin National Forest. The project will include excavation, drainage, road reconditioning, surface stabilization, trail reconditioning and surfacing, and installation of new turnouts, vault toilet, aggregate, and 2 large culverts. Key aspects of the project include:
• Excavation and drainage work
• Road reconditioning and surface stabilizati... | Title: Custer Gallatin NF Fairy Lake Phase 2 Road & Recreation Improvements, Agency: U.S. Department Of Agriculture, State: Utah, Open Date: 9/24/2025, Close Date: 5/30/2026, Last Updated Date: 10/2/2025
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.