State Hwy 31 Pipeline & Ground Storage Tank Contract 1-Pipeline
Federal opportunity from City of Waco. Place of performance: TX. Response deadline: Jun 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
Description
This project includes providing and installing 8,909 LF of water line of which 472 LF to be installed by Jack & Bore in 36-Inch steel casing pipe and 8,437 LF to be installed by open cut, gate valves, fittings, fire hydrants, air release valves, blowoff assemblies, concrete pavement replacements, hydrostatic pressure testing, disinfection, bacteriological testing, storm water pollution prevention, clearing and grubbing, maintenance of traffic, cleaning, planting, restoration, ancillary related work items per contract.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.