Water Supply Capacity Management Plans
Federal opportunity from Worcester County Government. Place of performance: MD. Response deadline: Apr 23, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 83 more rate previews.↓
Point of Contact
Agency & Office
Description
Worcester County invites qualified engineering consultants to submit proposals to prepare a Water Supply Capacity Management Plan (CMP) for both the Ocean Pines service area and the MD 611 Corridor system, develop a calibrated water model of the Ocean Pines system, including recommendations for water storage and water supply improvements for Ocean Pines and the MD 611 Corridor in conformity with the requirements contained in the Proposal Documents.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.