Skip to content
Department of Transportation

Construction of New Airport Traffic Control Tower (ATCT) - Grand Forks, ND

Solicitation: 697DCK-26-R-00034
Notice ID: ef73db77eb76b2bc2d44644b67ac3a8c
DepartmentDepartment of TransportationStateNDPostedMar 04, 2026, 12:00 AM UTCDueMar 25, 2026, 12:00 AM UTCCloses in 18 days

Federal opportunity from TRANSPORTATION, DEPARTMENT OF. Place of performance: ND. Response deadline: Mar 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,916,539,917
Sector total $1,916,539,917 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,530$2,497,319
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,916,539,917)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
ND, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
ND20260016 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026North Dakota • Oliver
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
IRONWORKER, STRUCTURAL
Base $35.95Fringe $33.11
+20 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 20 more rate previews.
Davis-BaconBest fitstate match
ND20260016 (Rev 1)
Open WD
Published Jan 30, 2026North Dakota • Oliver
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
IRONWORKER, STRUCTURAL
Base $35.95Fringe $33.11
Rate
LABORER (Common or General)
Base $29.20Fringe $22.19
+19 more occupation rates in this WD
Davis-Baconstate match
ND20260020 (Rev 2)
Open WD
Published Jan 30, 2026North Dakota • Billings
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
BRICKLAYER
Base $33.54Fringe $14.86
Rate
ELEVATOR MECHANIC
Base $62.52Fringe $38.43
+18 more occupation rates in this WD
Davis-Baconstate match
ND20260033 (Rev 1)
Open WD
Published Jan 30, 2026North Dakota • Benson, Cavalier, Eddy +12
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
POWER EQUIPMENT OPERATOR: GROUP 1
Base $40.20Fringe $25.25
Rate
GROUP 2
Base $40.20Fringe $25.25
+17 more occupation rates in this WD
Davis-Baconstate match
ND20260036 (Rev 1)
Open WD
Published Jan 30, 2026North Dakota • Dickey, Emmons, Grant +3
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
POWER EQUIPMENT OPERATOR: GROUP 1
Base $40.20Fringe $25.25
Rate
GROUP 2
Base $40.20Fringe $25.25
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

AMENDMENT 02 - Extends the proposal due date, incorporates Questions and Answers and revises Section L & M. AMENDMENT 01 - Extends the the deadline for submission of questions and the proposal due date. All other terms and conditions remain unchanged. See the attached amendment for the revised dates. The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower (ATCT) and Base Building at the Grand Forks International Airport in Grand Forks, ND. This solicitation is posted in accordance with FAA Acquisition Management Policy Section 3.2.1.3.11 Public Announcement. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services and shall not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses to this announcement and will not reimburse any vendors for cost incurred in responding to this public announcement.The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Erin.M.Crabtree@faa.gov.Attach ment J-1 Statement of WorkAttachment J-2 Specifications - Division IAttachment J-2 Specifications - Division IIAttachment J-2a Drawings

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.