East Lyme High School-Aquatic Center Roof Replacement
Federal opportunity from State of CT - DAS Procurement • East Lyme, Public Schools. Place of performance: CT. Response deadline: Feb 11, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Town of East Lyme (“Town”), through the East Lyme School Building Committee (“ELSBC”) is soliciting sealed bids from responsible qualified contractors for construction and related services for roof replacement and associated work at the East Lyme High School-Aquatic Center (the “Property”) located at 30 Chesterfield Road, East Lyme, Connecticut 06333 (the “Project”). Bidders are required to be pre-qualified by the Connecticut Department of Administrative Services (“DAS”) for work in the “roofing” prequalification classification. The Work for the Project generally consists of replacing the existing standing seam metal roof, structural purlins, acoustical insulation, removal and reinstallation of all interior and exterior items connected to the existing roof and all associated work of the roof systems as shown on the Bidding Documents for the Project.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.