Skip to content
Sussex County

Utility Planning

Solicitation: Not available
Notice ID: e59de2ed04418bcd90f809de0e019834
DepartmentSussex CountyStateDEPostedFeb 27, 2026, 12:00 AM UTCDueNo due date posted

Federal opportunity from Sussex County. Place of performance: DE.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for DE
Live POP
Place of performance
Sussex County, DE
State: DE
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Sussex County
Agency
Not available
Subagency
Not available
Office
Legal Notices
Contracting Office Address
Not available

Description

Utility Planning & Design Review is the first source of information and advice regarding current and future central sewer service areas operated by Sussex County. The Division is instrumental in the creation of new sanitary sewer districts and the expansion of existing sewer districts, which can be a lengthy process involving Public Meetings, Public Hearings and referendum votes. The Division reviews Concept Sewer plans for proposed new development throughout the county, while also reviewing proposed subdivision, conditional use and zoning change applications to insure that each project’s wastewater needs have been properly addressed. The Division’s Planning Studies define future sanitary sewer planning areas that in turn are used to project growth areas and to identify estimated timeframes for treatment plant upgrades. Other work items include the performance of Preliminary Engineering Reports and Environmental Assessments that are key components to finance the County’s sewer projects. Plan Resubmittal Fee Proposed Projects & Schedules Sussex County Engineering Plan Submission Form Engineering Forms Contact Information Director John Ashman Address Sussex County Administrative Office Building 3rd Floor, Room 324 2 The Circle, P.O. Box 589 Georgetown, DE 19947 Phone (302) 855-7370 Fax (302) 853-5881

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.