Skip to content
Mansfield

Architectural Design for New Animal Control Facility

Solicitation: Not available
Notice ID: e4f340698c566a0f5ab8c2b5a9c6bb99
DepartmentMansfieldAgencyState of CT - DAS ProcurementStateCTPostedJan 22, 2026, 12:00 AM UTCDueJan 22, 2026, 09:31 PM UTCExpired

Federal opportunity from State of CT - DAS Procurement • Mansfield, Town of. Place of performance: CT. Response deadline: Jan 22, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$964,691,384
Sector total $964,691,384 • Share 100.0%
Live
Median
$107,325
P10–P90
$28,414$4,168,590
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($964,691,384)
Deal sizing
$107,325 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for CT
Live POP
Place of performance
Hartford, CT
State: CT
Contracting office
450 Columbus Boulevard, Suite 1202 • Hartford, CT • 06103 United States

Point of Contact

Name
Sheri Baczanski
Email
baczanskise@mansfieldct.org
Phone
8604293331

Agency & Office

Department
Mansfield, Town of
Agency
State of CT - DAS Procurement
Subagency
State of CT - DAS Procurement
Office
CTsource / DAS Procurement
Contracting Office Address
450 Columbus Boulevard, Suite 1202
Hartford, CT
06103 United States

Description

In 2024, the Town of Mansfield contracted with Design Learned Inc. (DLI) to provide a study with conceptual design to determine the size of the replacement Animal Control facility needed. This study addressed the current and future Animal Control needs of the Town while taking into account new state Animal Shelter requirements that go in into effect on January 1, 2029. The study determined the required size of the facility needed with a conceptual floor plan and building design. In 2025 the Town of Mansfield contracted with Jacobson Engineering to conduct a feasibility study to determine if the new facility would be able to be built on the existing site currently occupied by the Town of Mansfield Animal Control Shelter. The DLI Study and Jacobson Engineering Study Development Documents are included as Appendix A.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.