Architectural Design for New Animal Control Facility
Federal opportunity from State of CT - DAS Procurement • Mansfield, Town of. Place of performance: CT. Response deadline: Jan 22, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
In 2024, the Town of Mansfield contracted with Design Learned Inc. (DLI) to provide a study with conceptual design to determine the size of the replacement Animal Control facility needed. This study addressed the current and future Animal Control needs of the Town while taking into account new state Animal Shelter requirements that go in into effect on January 1, 2029. The study determined the required size of the facility needed with a conceptual floor plan and building design. In 2025 the Town of Mansfield contracted with Jacobson Engineering to conduct a feasibility study to determine if the new facility would be able to be built on the existing site currently occupied by the Town of Mansfield Animal Control Shelter. The DLI Study and Jacobson Engineering Study Development Documents are included as Appendix A.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.